Package XL02 “Construction, supply, and equipment installation for Vam Leo Lock and Sluice” has a total contract value of 343 Billion VND.
location
Location
Ca Mau
calendar
Time
2026 - 2028
Construction of works under the Binh Goi Bridge Construction Investment Project. Cross-section: 19.75m, featuring 04 motor vehicle lanes with a design speed of 100 km/h.
Construction of works under the Nguyen Trai Bridge Construction Investment Project and urban beautification of the surrounding area; Tower pillar H=11m; Bridge width: 26.5m
The pier can accommodate vessels of 100,000 DWT and one berth for 20,000 DWT vessels. It is 63.5 meters wide; the total berth length is 352.84 meters. The design throughput capacity for cargo is approximately 3.3 million tons per year.
Construction of the viaduct section from P63 to Nga Tu So (excluding TKBVTC). Bored piles D1.5m, Road surface width: 53.5m - 59.5m, Cast-in beams on fixed scaffolding, Cast-in beams on mobile scaffolding, Balanced cantilever beams
Supply, installation of technological equipment and construction of works. Total capacity 140MW, more than 440,000 solar panels, 120-degree rotating rack system