Construction of works under the Nguyen Trai Bridge Construction Investment Project and urban beautification of the surrounding area; Tower pillar H=11m; Bridge width: 26.5m
location
Location
Hai Phong
calendar
Time
2023 - 2025
The pier can accommodate vessels of 100,000 DWT and one berth for 20,000 DWT vessels. It is 63.5 meters wide; the total berth length is 352.84 meters. The design throughput capacity for cargo is approximately 3.3 million tons per year.
Construction of the viaduct section from P63 to Nga Tu So (excluding TKBVTC). Bored piles D1.5m, Road surface width: 53.5m - 59.5m, Cast-in beams on fixed scaffolding, Cast-in beams on mobile scaffolding, Balanced cantilever beams
Supply, installation of technological equipment and construction of works. Total capacity 140MW, more than 440,000 solar panels, 120-degree rotating rack system
Golden Hills is planned by SOM – Skidmore, Owings & Merrill LLP, the world's leading urban design firm, with landscape design by Cicada (Singapore).
Supply, installation of technological equipment and construction of works. Total capacity 204MW, more than 700,000 solar panels