Golden Hills is planned by SOM – Skidmore, Owings & Merrill LLP, the world's leading urban design firm, with landscape design by Cicada (Singapore).
location
Location
Da Nang
calendar
Time
2010 - 2016
Supply, installation of technological equipment and construction of works. Total capacity 204MW, more than 700,000 solar panels
Supply, installation of technological equipment and construction of works. Total capacity 450MW. And construction of 500kV transformer station; 500kV, 220kV lines
Supply, installation of equipment and construction. Total capacity – 46.2 MW.
Underwater construction of bored piles D1.5m; SuperT beam L=39.2m; L max span=55.5m; Bsurface=20m.
Design - supply of technological equipment and construction of works
Providing and installing specialized equipment for projects and construction