Dự Án Cầu Mã Đà
Ma Da Bridge Construction Project

Scale

Project: Ma Da Bridge Construction

Package XL-11: Construction of Ma Da Bridge under the project: Investment and Construction of Ma Da Bridge, Dong Nai Province.

Class III Transportation Infrastructure Works. Design speed: 80 km/h.

Cross-section Specifications:
- 8 traffic lanes (8 x 3.75m = 30m)
- Median strip: 1.5m width
- Clearance / Safety strips (both sides): 2 x 0.5m = 1.0m
- Shoulders / Margins (both sides): 2 x 0.5m = 1.0m

Location

Dong Nai Province

Role

Joint Venture Leader

Investor

Urban Infrastructure Construction Investment Project Management Board

Value

260 Billion VND

Time of execution

2025 - 2028