TrungNamEC
Project under construction
The project is classified as a Group A investment project and a Grade II road infrastructure project, featuring six mixed-traffic lanes and a design speed of 80 km/h.
location
Location
Dong Nai Province
calendar
Time
2026
The project is classified as a Group A investment project and a Grade II road infrastructure project, featuring six mixed-traffic lanes and a design speed of 80 km/h.
Quoi An Bridge Project on Provincial Road No. 902, Vinh Long Province. The bridge is 12 m wide, accommodating two motor-vehicle lanes, with a design speed of 80 km/h and a total bridge length of 597.9 m.
Package XL-11: Construction of Ma Da Bridge under the project "Investment and Construction of Ma Da Bridge, Dong Nai Province" (Total Investment: 260 Billion VND).
Package XL02 “Construction, supply, and equipment installation for Vam Leo Lock and Sluice” has a total contract value of 343 Billion VND.
Construction of works under the Nguyen Trai Bridge Construction Investment Project and urban beautification of the surrounding area; Tower pillar H=111m; Bridge width: 26.5m
Package No. 18 (construction) Construction of the section from Km0+000 – Km6+200