Construction of dams, spillways, water intakes, water tunnels, hydroelectric plants, discharge channels, internal roads, 220kV power lines, 220kV transformer stations.
location
Location
Lam Dong
calendar
Time
February 2010 - April 2016
Construction of dams, spillways, water intakes, water tunnels, hydroelectric plants, discharge channels, internal roads, 220kV power lines, 220kV transformer stations.
Construction and installation of technical infrastructure systems, drainage systems, lighting systems, etc
Package No. 18 (construction) Construction of the section from Km0+000 – Km6+200
Construction of the CKN (Ceiling Control Center), column base, and technical infrastructure systems (drainage system, lighting system, etc.).
Package (No. 39): Construction of the main bridge from pier T37 to pier T40 (including waterway traffic control)
Package No. 02 – Construction Works: Section from Km113+200 to Km131+082 (including costs for ensuring waterway and roadway traffic safety; costs for surveying, preparing construction drawing design, and contingency costs) (Sub‑project 3 – TP3).​ Package No. 09 – Construction and Installation: Construction and installation of the section from Km131+300 to Km144+500 (including surveying and preparation of construction drawing design) (Sub‑project 4 – TP4).​