TrungNamEC
Project
Package No. 03: Construction of the section from Km101+500 to Km117+593 (including survey and design drawings) (EC)
location
Location
Khanh Hoa - Dak Lak
calendar
Time
Tháng 02/2023 - nay
XL-02 Package: Construction of Rach Mieu 2 cable-stayed bridge (section between the two anchor pylons) from Km5+913 to Km6+423 (including survey and construction drawing design), and assurance of waterway traffic safety for Rach Mieu 2 Bridge
Construction of two packages, XL04 and XL05, includes tower piers T29, T30, T31, bored piles D2.0m, and cable-stayed bridge deck girders.
Construction of 04 pier bases from T14 ÷ T17 (02 low pier bases and 02 anchor pier bases), anchor pier body T17 and low pier T16, lowering the bridge deck on pier T16, yellow strip T16 and part of pier T15;
Package XL-01: Construction of section Km53+000 – Km91+800 (including survey and design of construction drawings).
Phu Dinh Tide Control Sluice: Aperture 40m, Boat Lock B=15
Package XD05: Muong Chuoi Tide Control Sluice. Sluice aperture 4x40m; Boat lock width B=11m on 40x40 reinforced concrete pile foundation.