Package (No. 39): Construction of the main bridge from pier T37 to pier T40 (including waterway traffic control)
location
Location
HCMC - Dong Nai
calendar
Time
May 2027
Package No. 02 – Construction Works: Section from Km113+200 to Km131+082 (including costs for ensuring waterway and roadway traffic safety; costs for surveying, preparing construction drawing design, and contingency costs) (Sub‑project 3 – TP3).​ Package No. 09 – Construction and Installation: Construction and installation of the section from Km131+300 to Km144+500 (including surveying and preparation of construction drawing design) (Sub‑project 4 – TP4).​
Package No. 03: Construction of the section from Km101+500 to Km117+593 (including survey and design drawings) (EC)
Phu Dinh Tide Control Sluice: Aperture 40m, Boat Lock B=15
Package XD05: Muong Chuoi Tide Control Sluice. Sluice aperture 4x40m; Boat lock width B=11m on 40x40 reinforced concrete pile foundation.
Tide control sluice. Sluice aperture: B=2x40m=80m. Boat lock: B=15m
Tan Thuan Tide Control Sluice. Aperture 40m; 01 pumping station, Boat lock B=15m; CKN foundation D1500, L=60m.