TrungNamEC
Project
Construction of 04 pier bases from T14 ÷ T17 (02 low pier bases and 02 anchor pier bases), anchor pier body T17 and low pier T16, lowering the bridge deck on pier T16, yellow strip T16 and part of pier T15;
location
Location
Tien Giang – Vinh Long Province.
calendar
Time
August 2020 – present.
Package XL-01: Construction of section Km53+000 – Km91+800 (including survey and design of construction drawings).
Tide control sluice. Sluice aperture: B=1x40m=40m. Boat lock: B=15m
Construction of 04 pier bases from T14 ÷ T17 (02 low pier bases and 02 anchor pier bases), anchor pier body T17 and low pier T16, lowering the bridge deck on pier T16, yellow strip T16 and part of pier T15;
Tide control sluice. Sluice aperture: B=2x40m=80m. Boat lock: B=15m
Tide control sluice. Sluice aperture: B=1x40m=40m. Boat lock: B=15m
Tide control sluice. Sluice aperture: B=2x40m=80m. Upstream and downstream embankment: Reinforced concrete DUL SW 600A; D350.