TrungNamEC
Project
Construction and installation of technical infrastructure systems, drainage systems, lighting systems, etc
location
Location
Vinh Phuc - Phu Tho
calendar
Time
December 20, 2023
Package No. 18 (construction) Construction of the section from Km0+000 – Km6+200
Construction of the CKN (Ceiling Control Center), column base, and technical infrastructure systems (drainage system, lighting system, etc.).
Package (No. 39): Construction of the main bridge from pier T37 to pier T40 (including waterway traffic control)
Package No. 02 – Construction Works: Section from Km113+200 to Km131+082 (including costs for ensuring waterway and roadway traffic safety; costs for surveying, preparing construction drawing design, and contingency costs) (Sub‑project 3 – TP3).​ Package No. 09 – Construction and Installation: Construction and installation of the section from Km131+300 to Km144+500 (including surveying and preparation of construction drawing design) (Sub‑project 4 – TP4).​
Package No. 03: Construction of the section from Km101+500 to Km117+593 (including survey and design drawings) (EC)
XL-02 Package: Construction of Rach Mieu 2 cable-stayed bridge (section between the two anchor pylons) from Km5+913 to Km6+423 (including survey and construction drawing design), and assurance of waterway traffic safety for Rach Mieu 2 Bridge