Package No. 02 – Construction Works: Section from Km113+200 to Km131+082 (including costs for ensuring waterway and roadway traffic safety; costs for surveying, preparing construction drawing design, and contingency costs) (Sub‑project 3 – TP3).
Package No. 09 – Construction and Installation: Construction and installation of the section from Km131+300 to Km144+500 (including surveying and preparation of construction drawing design) (Sub‑project 4 – TP4).