Supply, installation of equipment and construction. Total capacity – 46.2 MW.
location
Location
Ninh Thuan
calendar
Time
January 2021 - Present
Underwater construction of bored piles D1.5m; SuperT beam L=39.2m; L max span=55.5m; Bsurface=20m.
Design - supply of technological equipment and construction of works
Providing and installing specialized equipment for projects and construction
Construction of dams, spillways, water intakes, water tunnels, hydroelectric plants, discharge channels, internal roads, 220kV power lines, 220kV transformer stations.
Construction of dams, spillways, water intakes, water tunnels, hydroelectric plants, discharge channels, internal roads, 220kV power lines, 220kV transformer stations.
Construction and installation of technical infrastructure systems, drainage systems, lighting systems, etc