Rach Xuyen Tam Canal Project
Scale
Rach Xuyen Tam Canal has a total length of 8.875 km, comprising a 6.638 km main canal and three branch canals (Cau Son, Binh Loi and Binh Trieu) with a combined length of 2.237 km.
Construction Package XL-01: the section from Nhieu Loc – Thi Nghe Canal to Bui Dinh Tuy Bridge, including Cau Son Canal (Km0+000 to Km2+512). The package is part of the Rach Xuyen Tam Canal Dredging, Environmental Improvement and Infrastructure Construction Project (from Nhieu Loc – Thi Nghe Canal to Vam Thuat River), in Binh Thanh District and Go Vap District.
Commencement date: 18 November 2025
Construction period: 950 days