Construction of the CKN (Ceiling Control Center), column base, and technical infrastructure systems (drainage system, lighting system, etc.).
location
Location
Da Nang
calendar
Time
September 2013 – April 2016
XL-02 Package: Construction of Rach Mieu 2 cable-stayed bridge (section between the two anchor pylons) from Km5+913 to Km6+423 (including survey and construction drawing design), and assurance of waterway traffic safety for Rach Mieu 2 Bridge
Construction of two packages, XL04 and XL05, includes tower piers T29, T30, T31, bored piles D2.0m, and cable-stayed bridge deck girders.
Construction of 04 pier bases from T14 ÷ T17 (02 low pier bases and 02 anchor pier bases), anchor pier body T17 and low pier T16, lowering the bridge deck on pier T16, yellow strip T16 and part of pier T15;