Bach Phu Thinh Complex
Scale
Construction of the basement structure.
- Total floor area = 9,856 m².
- Total volume of concrete = 13,254 m³.
- Total mass of steel = 2,126 tons.
Construction of the basement structure.
- Total floor area = 9,856 m².
- Total volume of concrete = 13,254 m³.
- Total mass of steel = 2,126 tons.