Vinh Phu Bridge Project
Scale
Construction and installation of technical infrastructure systems, including drainage and lighting systems, etc.
Grade I road bridge works
-
Main extradosed bridge, span arrangement: 2x35 m + (80 + 130 + 80) m + 2x35 m + (19 + 2x20 + 19) m = 509.55 m
-
Bridge width: 16.5 – 19.0 m
-
Prestressed reinforced concrete box girder
-
16 m high pylons with stay cables anchored over saddles
-
Foundation system: Bored piles with diameters of 1.2 m and 1.5 m
Project images
Dự án liên quan



