Cau vuot nga ba hue
The Hue T-Junction Overpass

Scale

Construction of CKN, pier footing and pier body, and technical infrastructure systems (drainage system, lighting system, etc.).

Ground level:

  • Arrangement of frontage roads without level crossings with the railway to serve local traffic.​

  • Each branch of the frontage road at the roundabout level (Level 1 flyover) has a carriageway width of 7.0 m.​

  • Including one circular viaduct over the railway and ramp bridges connecting to the roundabout.​

Level 2 flyover:

Gồm các nhịp dẫn và dây văng nối đường Tôn Đức Thắng với đường Điện Biên Phủ
Comprising approach spans and cable-stayed spans connecting Ton Duc Thang Street with Dien Bien Phu Street.

  • Width of the cable-stayed deck: 19.8 m.​

  • Width of the bridge at the approach spans: 17.0 m (including both directions of traffic on the ramps).​

  • T6 tower pier: parabolic-shaped reinforced concrete pylon (60 m high) on a D2.0 m bored pile foundation.

Location

Da Nang

Role

Joint venture contractor

Investor

Trung Nam Hue Junction BT Company Limited

Value

484/922.40 billion VND

Time of execution

September 2013 – April 2016