Trungnam E&C is committed to protecting personal information of candidates. The information you provide through the registration form is used solely for internal recruitment purposes. We do not share or sell information to any third party. If you have any questions about privacy protection, please contact: info.tnec@trungnamgroup.com.vn
Where is Trung Nam E&C Company Address Located?
Ground Floor, Safomec Building, 7/1 Thanh Thai Street, Dien Hong Ward, Ho Chi Minh City, Vietnam.
Trungnam E&C Message
We are not just looking for subcontractors – we are looking for like-minded people.
We are looking for real partners to work together, share opportunities, and grow together.
What highway projects is Trungnam E&C currently constructing?
Year 2023
Component Project Phase - Hau Giang - Ca Mau, part of the North-South Eastern Expressway Project Phase 2021-2025. Package XL-01: Construction of the section from Km53+000 - Km91+800 (including survey, design and construction drawings).
• Investment project for the construction of Chau Doc - Can Tho - Soc Trang Expressway Phase 1. Package 02: Section from Km113+200 to Km131+082 (Including water traffic security costs, survey costs, design, construction drawings and contingency costs) (TP3). Package 09: Construction and installation of the section from Km131+300 to Km144+500 (including survey, design and construction drawings) (TP4).
• Component Project 1 of the Bien Hoa - Vung Tau Expressway Investment and Construction Project Phase 1
• Package 18 (Construction) Construction of the section from Km 0+000 - Km 6+200.
• Component Project 3 of the Khanh Hoa - Buon Ma Thuot Expressway Investment and Construction Project Phase 1. Package 03: Construction of the section from Km101+500 - Km117+593 (including survey, design and construction drawings) (EC).
• Investment and construction project of the Rach Mieu 2 Bridge connecting Tien Giang Province and Ben Tre Province. Package XL-02: Construction of the Rach Mieu 2 cable-stayed bridge (between 2 towers) Km5+913 - Km6+423 (including survey, design and construction) and ensuring traffic safety on the Rach Mieu 2 bridge.
• Phuoc An Bridge Project, Phu My Town, Ba Ria - Vung Tau Province and Nhon Trach District, Dong Nai Province
• Package (No. 39): Construction and installation of the main bridge from tower T37 to tower T40 (including water traffic control)
Year 2024
• Package 15-XL: Construction of the Dai Ngai 1 Bridge and connecting roads at both ends (including maritime safety) of the Dai Ngai Bridge investment and construction project on QL60 within Tra Vinh and Soc Trang provinces
Year 2025
• Package 14: Main cable-stayed bridge construction of Component Project 1: Construction of works of the Nguyen Trai Bridge investment and construction project and urban renewal in surrounding areas.
• Package XL-03: Construction and installation of Hoa Son Bridge and base, pavement, and other works on the section from Km40+750 - Km50+260 of the Hoa Binh - Moc Chau Expressway project (section from Km19+000 - Km53+000 in Phu Tho Province)
• Package 35: Construction and installation from Km3+498 (Tower T74 elevated bridge line) to the end of the section, part of the connecting road project to the Bien Hoa Vung Tau Expressway
• Package XL-3: Construction of the Rach Ba Bep tidal gate (including closing equipment, mechanical systems, electrical systems, and automatic water level monitoring systems) and dikes around Rach Ba Bep (from Ba Bep Bridge to Saigon River). PROJECT: Upgrading water infrastructure on the right bank of the Saigon River, Cu Chi District from Provincial Road 8 to Rach Tra (North Rach Tra)
• Package XL-01: Section from Nhieu Loc - Thi Nghe Canal to Bui Dinh Tuy Bridge, including Cau Son Creek (from Km0+000 to Km2+512) of the Rach Xuyen Tam Dredging, Environmental Improvement and Infrastructure Development Project (from Nhieu Loc - Thi Nghe Canal to Vam Thuat River) Binh Thanh District, Go Vap District.
• Package XL-27: Construction works - Component Project 2: Investment and construction of Thuong Cat entrance and connecting roads.
• Trung Nam Tra Vinh Solar Power Plant - Phase 2:
• Location: Duyen Hai Ward, Vinh Long Province
• Capacity: 50 MW and battery storage system 5 MWh
• Total investment: 800.7 billion VND
• Expected construction timeline: 12 months (December 2025 - December 2026)
• Investment and operation of Ca Na Industrial Zone Infrastructure Project - Phase 1: Scale 378 ha, total investment 3,785.9 billion VND