Vu Yen Bridge Project - Hai Phong
Vu Yen Bridge Project – Hai Phong

Scale

General Contractor prepares the project proposal, survey, prepares the basic design document (Feasibility Study Report), construction drawing design (BVTC), environmental protection commitment, and construction of Vu Yen Bridge.
Bridge Project - Grade II:

Underwater construction of D1.5m bored piles; SuperT girders L=39.2m; maximum span L=55.5m; Deck width B=20m.
Reinforced concrete (RC) box retaining wall on pre-stressed reinforced concrete (RC) pile foundation.

Location

Hai Phong

Role

EC general contractor

Investor

Vingroup Corporation - Joint Stock Company

Giá trị đảm nhận

288.4 billion VND

Time of execution

October 2017 - April 2018

Project images

Vu Yen Bridge Project - Hai Phong