Construction of the diversion dam (weir), spillway, intake structure, water tunnel, hydropower plant, tailrace channel, internal roads, 220kV transmission line, and 220kV substation.

Scale: Krong No 2:

• Dam with 4 spillway bays, 35.5m high, 270m long

• Gravity concrete structure

• Reservoir capacity: 9.3 million m³

• Capacity: 30MW

• Average annual electricity output: 105 million kWh/year

Scale: Krong No 3:

• Dam 41.5m high, 270m long

• Free overflow spillway 120m wide

• Gravity concrete structure

• Reservoir capacity: 18.12 million m³

• Capacity: 18MW

• Average annual electricity output: 65 million kWh/year

Location

Lam Dong

Role

Main contractor

Investor

Trung Nam Krong No Hydropower Joint Stock Company

Value

1,230.16 billion VND

Time of execution

February 2010 - April 2016