Scale
Construction of the diversion dam (weir), spillway, intake structure, water tunnel, hydropower plant, tailrace channel, internal roads, 220kV transmission line, and 220kV substation.
Scale: Krong No 2:
• Dam with 4 spillway bays, 35.5m high, 270m long
• Gravity concrete structure
• Reservoir capacity: 9.3 million m³
• Capacity: 30MW
• Average annual electricity output: 105 million kWh/year
Scale: Krong No 3:
• Dam 41.5m high, 270m long
• Free overflow spillway 120m wide
• Gravity concrete structure
• Reservoir capacity: 18.12 million m³
• Capacity: 18MW
• Average annual electricity output: 65 million kWh/year