Dong Nai 2 Hydropower Project
Dong Nai 2 Hydropower Project

Scale

Construction of the diversion dam (weir), spillway, intake structure, headrace tunnel, hydropower plant, tailrace channel, internal roads, 220kV transmission line, and 220kV substation.

The dam has 5 spillway bays, is 80m high, 800m long, with a gravity concrete structure, and a reservoir capacity of 281 million m³ at normal water level (NWL) of 680m.

Capacity is 70MW, with an average annual electricity output of 263.8 million kWh.

Location

Lam Dong

Role

Main contractor

Investor

Trung Nam Hydropower Joint Stock Company

Value

1,760.41 billion VND

Time of execution

August 2008 - November 2014