Package (No. 39): Construction of the main bridge from pier T37 to pier T40 (including waterway traffic regulation).​

Special-class bridge work.

  • Maximum span length of 250 m, prestressed reinforced concrete box girder.​

  • Bored pile foundations with diameters D1.2 m and D2.0 m.​

  • Pylons 115.9 m high with saddle-type cable anchorage system.​

  • Contract value: VND 1,803 billion.

Location

HCMC - Dong Nai

Role

The leading contractor in the consortium

Investor

Cai Mep - Thi Vai Port Area Transportation Project Management Board

Value

1,140.1 billion VND

Time of execution

May 2027

Project images

Latest progress of Phuoc An Bridge
Progress of Phuoc An bridge project
Du-an-cau-phuoc-an
Cau-Phuoc-An
Phuoc An Bridge: First Stay Cable Bundle Tensioning