Bach Dang Bridge

Scale

Construction of two contract packages XL04 and XL05: Including pylons T29, T30, T31, bored piles with diameter D2.0 m, and the cable-stayed bridge deck girder system.​

Special-class transport infrastructure project.

  • Expressway scale: 4 lanes, carriageway width 25 m.​

  • Design speed: Vd = 100 km/h.​

  • Main cable-stayed bridge with span arrangement (110 + 2×240 + 110) m.​

  • H-shaped reinforced concrete pylons with heights ranging from 96.5 m to 97.5 m.​

  • Main cable-stayed girder with two cable planes, prestressed reinforced concrete girder constructed by balanced cantilever method.

Location

Hai Phong

Role

Main contractor

Investor

Bach Dang Bridge BOT Joint Stock Company

Value

1.431 billion VND

Time of execution

September 2018