Chau Doc Can Tho Soc Trang Expressway
Scale
Package No. 02: Section from Km113+200 to Km131+082 (including costs for ensuring waterway and roadway traffic safety; costs for surveying, preparing construction drawing design, and contingency costs) (TP3).
Scope of work value: VND 2,812.6 billion.
Package No. 09: Construction and installation of the section from Km131+300 to Km144+500 (including surveying and preparation of construction drawing design) (TP4).
Scope of work value: VND 617.7 billion.
Chau Doc – Can Tho – Soc Trang Expressway, Phase 1.
-
The total route length is 188.2 km, running through four provinces/cities: An Giang, Can Tho, Hau Giang, and Soc Trang.
-
Four-lane expressway with a design speed of 100 km/h.
Project images
Dự án liên quan