Company-Introduction-trung-nam-ec
Modern Technology - Long Lasting Quality
Khanh Hoa - Buon Ma Thuot Expressway
Khanh Hoa - Buon Ma Thuot Expressway
Ca Na General Seaport
Ca Na General Seaport
Bien Hoa - Vung Tau Expressway
Bien Hòa - Vung Tau Expressway
Muong Chuoi flood prevention project
Muong Chuoi flood prevention project
expediting-the-chau-doc-can-tho-soc-trang-expressway
Chau Doc - Can Tho - Soc Trang Expressway
Rach Mieu 2 Bridge
Rach Mieu 2 Bridge Project

Construction pioneer
Infrastructure and renewable energy

Trungnam E&C was established on May 23, 2008, and is one of the leading units in the field of infrastructure construction, renewable energy and industry in Vietnam. With the mission of providing sustainable construction solutions and pioneering technology, Trungnam E&C has been affirming its position through a series of large-scale projects across the country.

Year of development
Construction equipment
Project implementation
Human Resources
Learn more
TrungNamEC
Hanoi Ring Road 2 Project
Du-an-dien-gio-eanam-dak-lak
TrungNamEC
01
/04
Transport infrastructure
Transport infrastructure is the field of construction of works such as roads, bridges, tunnels, ports, airports... to connect regions, promote economic and social development.
Learn more
02
/04
Infrastructure & Urban
Transport infrastructure is the field of construction of works such as roads, bridges, tunnels, ports, airports... to connect regions, promote economic and social development.
Learn more
03
/04
Industrial & Energy Construction
This has been the company's main and important field of operation since its inception until now and will always be one of the company's strategic industries in the future.
Learn more
04
/04
Civil & Public
Technical and urban infrastructure includes systems such as water supply and drainage, lighting, telecommunications, waste treatment, etc. to help ensure stable operation and sustainable development for the city.
Learn more

Field of operation

TrungNamEC
Hanoi Ring Road 2 Project
Du-an-dien-gio-eanam-dak-lak
TrungNamEC
TrungNamEC
Optional
Location
Tien Giang – Vinh Long Province.
Construction time
August 2020 – present.
Learn more
TrungNamEC
Highways, main roads in urban areas and industrial parks
Location
Hau Giang – Ca Mau Province
Construction time
30/11/2025
Learn more
Ben Nghe Tide Prevention Project
Water supply and drainage system, wastewater treatment
Location
HCM City
Construction time
July 2016 - present
Learn more
Cay kho Tidal Floodgate
Water supply and drainage system, wastewater treatment
Location
Ho Chi Minh City
Construction time
July 2016 - present
Learn more
Muong Chuoi Tidal Floodgate
Water supply and drainage system, wastewater treatment
Location
Ho Chi Minh City
Construction time
July 2016 - present
Learn more
Phu Dinh Tidal Floodgate
Water supply and drainage system, wastewater treatment
Location
Ho Chi Minh City
Construction time
July 2016 - present
Learn more
Phu Xuan tidal floodgate
Water supply and drainage system, wastewater treatment
Location
Ho Chi Minh City
Construction time
July 2016 - present
Learn more
Tan Thuan Tidal Floodgate
Water supply and drainage system, wastewater treatment
Location
Ho Chi Minh City
Construction time
July 2016 - present
Learn more
TrungNamEC
Optional
Location
Hau Giang – Ca Mau Province
Construction time
30/11/2025
Learn more
TrungNamEC
Optional
Location
Tien Giang – Vinh Long Province.
Construction time
August 2020 – present.
Learn more
Rach Mieu 2 Bridge Inauguration Ceremony
News - Events
On the morning of August 19, 2025, the Rach Mieu 2 Bridge Inauguration Ceremony successfully took place. This vital project, spanning the Tien River and connecting Dong Thap and Vinh Long provinces, marks not only a historical milestone for the transportation sector but also symbolizes the resilience, intellect, and internal strength of Vietnamese construction enterprises. I. A Historic Inauguration Ceremony and Timeless Imprint It was a meaningful day as the entire country celebrated the 80th anniversary of the August Revolution and prepared to welcome National Day on September 2nd (September 2, 1945 – September 2, 2025). The event was attended by high-ranking leaders such as Standing Deputy Prime Minister Nguyen Hoa Binh, former National Assembly Chairwoman Nguyen Thi Kim Ngan, along with leaders from the Ministry of Construction and relevant localities. The completion and inauguration of Rach Mieu 2 Bridge, approximately 5 months ahead of the initial schedule, is a proud achievement. This is a clear testament to the self-reliance of Vietnam’s construction industry, as domestic units have mastered the entire process of design, construction, and equipment manufacturing for a large-scale cable-stayed bridge project. Trungnam E&C is committed to delivering the highest value to customers, shareholders, and employees, with projects meeting high quality standards, ensuring progress and absolute safety, contributing to “Creating Sustainable Value” for Vietnam.   II. Rach Mieu 2 Bridge: A New Lifeline for Dong Thap and Vinh Long Rach Mieu 2 Bridge and its approach roads have a total length of 17.6 km, with a total investment of 6,810 billion VND from the state budget. The main bridge section is 1.97 km long, designed as a cable-stayed bridge with 112 cable bundles and two main towers reaching 116.5 m high. The main span is 270m long, the bridge deck is 21.5 m wide, with 4 mixed-use lanes and a
Phuoc An Bridge Project
Project
The Phuoc An Bridge project reaches a significant milestone: successfully installed 4 cable stays at T38 tower in November 2025, exceeding the timeline by 6 months, on track to achieve technical operation by the end of 2026. Scale of the “Super Project” Phuoc An Bridge    The Phuoc An Bridge project commenced in June 2023 with a total investment of approximately 4,900 trillion VND: • Location: Phu My (HCMC) ↔ Nhon Trach (Dong Nai) • Type: Modern Extradosed cable-stayed bridge, the most advanced of its kind, with a main span of 250m • Clearance: 55m height, ensuring vessels with 30,000 DWT capacity can operate smoothly on Thi Vai River • Scale: 4.38km long (main bridge 3.5km), 6 lanes, speed limit 70km/h • Progress: 6 months ahead of schedule • Contractor: Trungnam E&C – Bac Trung Nam construction consortium building main tower T38 • Expected operation: End of 2026 This project helps shorten the distance from the Cai Mep – Thi Vai port area to the Ben Luc – Long Thanh expressway by approximately 30 km, reducing traffic pressure on National Highway 51 and boosting logistics capabilities in the strategic southern economic region. Construction Progress at T38 Tower in November The project management board of the Transportation Sector and the Department of Agriculture in Ba Ria – Vung Tau reported that construction activities at the Phuoc An Bridge are progressing urgently 24/7. The most notable achievement in November 2025 was the successful installation of 4 cable bundles at the main T38 tower by the Trungnam E&C – Bac Trung Nam consortium. Completing 4 cable bundles in just over 2 months since the first cable installation on September 4, 2025, demonstrates the contractor’s superior construction capabilities. The construction team is carefully preparing plans to install the next cable bundles in Q4