{"id":3627,"date":"2026-01-28T11:06:17","date_gmt":"2026-01-28T04:06:17","guid":{"rendered":"https:\/\/trungnamec.com.vn\/du-an-nhiet-dien-lng-ca-na-1500mw\/"},"modified":"2026-09-28T14:42:57","modified_gmt":"2026-09-28T07:42:57","slug":"du-an-nhiet-dien-lng-ca-na-1500mw","status":"publish","type":"post","link":"https:\/\/trungnamec.com.vn\/en\/trungnam-group-officially-becomes-the-investor-for-the-1500mw-ca-na-lng-power-project\/","title":{"rendered":"TRUNGNAM GROUP OFFICIALLY BECOMES THE INVESTOR FOR THE 1,500MW CA NA LNG POWER PROJECT"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><em>On January 28, 2026, the People&#8217;s Committee of Khanh Hoa Province issued Decision No. 339\/QD-UBND approving the selection results for the investor of the Ca Na LNG Power Plant Project. Accordingly, the Trung Nam \u2013 Sideros River Joint Venture has officially become the investor of this key energy project, with a total investment capital exceeding 57,000 billion VND.<\/em><\/span><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_74 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/trungnamec.com.vn\/en\/trungnam-group-officially-becomes-the-investor-for-the-1500mw-ca-na-lng-power-project\/#A_New_Landmark_on_the_National_Energy_Map\" >A New Landmark on the National Energy Map<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/trungnamec.com.vn\/en\/trungnam-group-officially-becomes-the-investor-for-the-1500mw-ca-na-lng-power-project\/#Strategic_Significance\" >Strategic Significance<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/trungnamec.com.vn\/en\/trungnam-group-officially-becomes-the-investor-for-the-1500mw-ca-na-lng-power-project\/#PROJECT_SUMMARY\" >PROJECT SUMMARY<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"A_New_Landmark_on_the_National_Energy_Map\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">A New Landmark on the National Energy Map<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-path-to-node=\"6\"><span style=\"font-family: arial, helvetica, sans-serif;\">According to the approval Decision, the Ca Na LNG Power Plant Project is located in Ca Na Commune, with the objective of developing one of the most modern energy complexes in the South Central Region. The project covers a total land and water surface area of approximately 265.7 hectares, comprising the following primary components:<\/span><\/p>\n<ul style=\"list-style-type: circle;\">\n<li data-path-to-node=\"7,0,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Combined Cycle Gas Turbine (CCGT) Power Plant: Capacity of 1,500 MW.<\/span><\/li>\n<li data-path-to-node=\"7,1,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">LNG Terminal and Regasification System: Throughput capacity of 1.0 \u2013 1.2 million tonnes\/year, equipped with a storage tank capacity of 220,000 m\u00b3.<\/span><\/li>\n<li data-path-to-node=\"7,2,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Seaport Infrastructure System: Includes a 2,400m-long breakwater and a dedicated LNG receiving jetty.<\/span><\/li>\n<\/ul>\n<p data-path-to-node=\"8\"><span style=\"font-family: arial, helvetica, sans-serif;\">With a total execution cost reaching 57,384.78 billion VND, this is one of the largest energy infrastructure projects approved for investment during the 2025\u20132030 period.<\/span><\/p>\n<figure id=\"attachment_2876\" aria-describedby=\"caption-attachment-2876\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2876 size-full\" title=\"Du an nhiet dien-LNG-Ca Na\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na.webp\" alt=\"Du an nhiet dien-LNG-Ca Na\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2876\" class=\"wp-caption-text\">Perspective rendering of the 1,500 MW Ca Na LNG Power Project.<\/figcaption><\/figure>\n<p data-path-to-node=\"11\"><span style=\"font-family: arial, helvetica, sans-serif;\">As a leading renewable energy and infrastructure corporation in Vietnam, Trungnam Group (through the joint venture) commits to concentrating maximum financial resources, equipment, and workforce to execute the project.<\/span><\/p>\n<p data-path-to-node=\"12\"><span style=\"font-family: arial, helvetica, sans-serif;\">According to the awarded decision, the proposed electricity tariff is 3,294.22 VND\/kWh. The investor commits to completing construction and commissioning the project for commercial operation (COD) prior to December 31, 2030.<\/span><\/p>\n<p data-path-to-node=\"13\"><span style=\"font-family: arial, helvetica, sans-serif;\">Winning the bid for the Ca Na LNG project further extends the track record of success and affirms Trungnam Group&#8217;s position in the energy sector. Previously, the Group made significant marks with a series of large-scale projects, contributing billions of kWh to the national grid, notably:<\/span><\/p>\n<ul style=\"list-style-type: circle;\">\n<li data-path-to-node=\"14,0,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Ea Nam Wind Power Project (Dak Lak): The largest onshore wind power plant in Vietnam with a capacity of 400MW.<\/span><\/li>\n<li data-path-to-node=\"14,1,0\"><span style=\"font-family: arial, helvetica, sans-serif;\"><a href=\"https:\/\/trungnamec.com.vn\/en\/project\/project-completed\/trung-nam-thuan-nam-450mw-solar-power-project\/\">Trung Nam Thuan Nam 450MW Solar Power Project: <\/a>A landmark project combining a 500kV substation and transmission line\u2014the first privately invested transmission infrastructure in Vietnam.<\/span><\/li>\n<li data-path-to-node=\"14,2,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Renewable Energy Complex in Ninh Thuan: Includes a series of Ninh Thuan Wind Power Plants (No. 1, 2, 3) and large-scale solar power projects, transforming a arid region into the country&#8217;s energy hub.<\/span><\/li>\n<\/ul>\n<p data-path-to-node=\"15\"><span style=\"font-family: arial, helvetica, sans-serif;\">The extensive experience gained from the rapid execution of these projects serves as a strong assurance of execution capacity for Trungnam Group and Trungnam E&amp;C in this Ca Na LNG megaproject.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Strategic_Significance\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">Strategic Significance<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-path-to-node=\"18\"><span style=\"font-family: arial, helvetica, sans-serif;\">Upon completion, the Ca Na LNG Project will play a pivotal role in:<\/span><\/p>\n<ul style=\"list-style-type: circle;\">\n<li data-path-to-node=\"19,0,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Operationalizing Power Development Plan VIII (PDP VIII): Executing Decision No. 500\/QD-TTg issued by the Prime Minister.<\/span><\/li>\n<li data-path-to-node=\"19,1,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Ensuring Energy Security: Adding a crucial, stable baseload power source to the national grid, while significantly reducing emissions compared to traditional coal-fired power.<\/span><\/li>\n<li data-path-to-node=\"19,2,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Driving Local Economic Growth: Creating economic momentum, generating employment opportunities, and making substantial contributions to the state budget throughout the project&#8217;s 50-year operational lifespan.<\/span><\/li>\n<\/ul>\n<figure id=\"attachment_2877\" aria-describedby=\"caption-attachment-2877\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2877 size-full\" title=\"Du an nhiet dien LNG-Ca Na\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na-1.webp\" alt=\"Du an nhiet dien LNG-Ca Na\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na-1.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na-1-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na-1-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/01\/Du-an-nhiet-dien-LNG-Ca-Na-1-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2877\" class=\"wp-caption-text\">With a total execution cost of up to 57,384.78 billion VND, this is one of the largest energy infrastructure projects approved for investment during the 2025\u20132030 period<\/figcaption><\/figure>\n<div class=\"container\">\n<div id=\"model-response-message-contentr_255caacb6a875e8d\" class=\"markdown markdown-main-panel md-content enable-updated-hr-color force-compact-layout\" dir=\"ltr\" aria-busy=\"false\" aria-live=\"polite\">\n<h3 data-path-to-node=\"23\"><span class=\"ez-toc-section\" id=\"PROJECT_SUMMARY\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">PROJECT SUMMARY<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul style=\"list-style-type: circle;\">\n<li data-path-to-node=\"24,0,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Project Name: Ca Na LNG Power Plant Project.<\/span><\/li>\n<li data-path-to-node=\"24,1,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Investor: Trung Nam \u2013 Sideros River Joint Venture.<\/span><\/li>\n<li data-path-to-node=\"24,2,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Capacity: 1,500 MW.<\/span><\/li>\n<li data-path-to-node=\"24,3,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Total Investment Capital: ~57,385 billion VND.<\/span><\/li>\n<li data-path-to-node=\"24,4,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Completion Schedule: Prior to December 31, 2030.<\/span><\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-right kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;right&quot;,&quot;id&quot;:&quot;3627&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;6&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;4.8&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;4.8\\\/5 - (6 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;TRUNGNAM GROUP OFFICIALLY BECOMES THE INVESTOR FOR THE 1,500MW CA NA LNG POWER PROJECT&quot;,&quot;width&quot;:&quot;136.7&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 136.7px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            4.8\/5 - (6 votes)    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>On January 28, 2026, the People&#8217;s Committee of Khanh Hoa Province issued Decision No. 339\/QD-UBND approving the selection results for the investor of the Ca Na LNG Power Plant Project. Accordingly, the Trung Nam \u2013 Sideros River Joint Venture has officially become the investor of this key energy project, with a total investment capital exceeding 57,000 billion VND. A New Landmark on the National Energy Map According to the approval Decision, the Ca Na LNG Power Plant Project is located in Ca Na Commune, with the objective of developing one of the most modern energy complexes in the South Central Region. The project covers a total land and water surface area of approximately 265.7 hectares, comprising the following primary components: Combined Cycle Gas Turbine (CCGT) Power Plant: Capacity of 1,500 MW. LNG Terminal and Regasification System: Throughput capacity of 1.0 \u2013 1.2 million tonnes\/year, equipped with a storage tank capacity of 220,000 m\u00b3. Seaport Infrastructure System: Includes a 2,400m-long breakwater and a dedicated LNG receiving jetty. With a total execution cost reaching 57,384.78 billion VND, this is one of the largest energy infrastructure projects approved for investment during the 2025\u20132030 period. As a leading renewable energy and infrastructure corporation in Vietnam, Trungnam Group (through the joint venture) commits to concentrating maximum financial resources, equipment, and workforce to execute the project. According to the awarded decision, the proposed electricity tariff is 3,294.22 VND\/kWh. The investor commits to completing construction and commissioning the project for commercial operation (COD) prior to December 31, 2030. Winning the bid for the Ca Na LNG project further extends the track record of success and affirms Trungnam Group&#8217;s position in the energy sector. Previously, the Group made significant marks with a series of large-scale projects, contributing billions of kWh to the national grid, notably: Ea Nam Wind<\/p>\n","protected":false},"author":3,"featured_media":2878,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[45],"tags":[406,407,408],"class_list":["post-3627","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology-news","tag-ca-na-lng-power-project","tag-trungnam","tag-trungnam-ec"],"acf":[],"_links":{"self":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/3627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/comments?post=3627"}],"version-history":[{"count":3,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/3627\/revisions"}],"predecessor-version":[{"id":3628,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/3627\/revisions\/3628"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media\/2878"}],"wp:attachment":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media?parent=3627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/categories?post=3627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/tags?post=3627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}