{"id":3617,"date":"2026-03-20T09:39:38","date_gmt":"2026-03-20T02:39:38","guid":{"rendered":"https:\/\/trungnamec.com.vn\/hinh-anh-moi-nhat-cau-phuoc-an\/"},"modified":"2026-09-23T15:02:51","modified_gmt":"2026-09-23T08:02:51","slug":"hinh-anh-moi-nhat-cau-phuoc-an","status":"publish","type":"post","link":"https:\/\/trungnamec.com.vn\/en\/latest-photos-of-phuoc-an-bridge-2026\/","title":{"rendered":"Latest Photos of Ph\u01b0\u1edbc An Bridge 2026"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><em>As of March 2026, the mega-project Ph\u01b0\u1edbc An Bridge connecting Ho Chi Minh City and \u0110ong Nai Province is witnessing rapid, continuous progress. Through non-stop day-and-night efforts, the contractor consortium of Trungnam E&amp;C \u2013 Trung Ch\u00ednh has completed 8 stay cables at pier T38 and 7 stay cables at pier T37, progressing 7 months ahead of schedule and bringing the project into its crucial final phase toward main span closure.<\/em><\/span><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_74 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/trungnamec.com.vn\/en\/latest-photos-of-phuoc-an-bridge-2026\/#Over_81_Work_Volume_Completed_in_March_7_Months_Ahead_of_Schedule\" >Over 81% Work Volume Completed in March, 7 Months Ahead of Schedule<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/trungnamec.com.vn\/en\/latest-photos-of-phuoc-an-bridge-2026\/#8_Stay_Cables_Tensioned_Moving_Toward_Main_Span_Closure\" >8 Stay Cables Tensioned, Moving Toward Main Span Closure<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/trungnamec.com.vn\/en\/latest-photos-of-phuoc-an-bridge-2026\/#Phuoc_An_Bridge_Economic_Connector_for_the_Southeast_Region\" >Ph\u01b0\u1edbc An Bridge: Economic Connector for the Southeast Region<\/a><\/li><\/ul><\/nav><\/div>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Over_81_Work_Volume_Completed_in_March_7_Months_Ahead_of_Schedule\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">Over 81% Work Volume Completed in March, 7 Months Ahead of Schedule<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-path-to-node=\"5\"><span style=\"font-family: arial, helvetica, sans-serif;\"><a href=\"https:\/\/www.youtube.com\/shorts\/EV5a3-k_GJM\" target=\"_blank\" rel=\"noopener\">Ph\u01b0\u1edbc An Bridge Project<\/a> is undergoing its peak construction period. According to the latest work output report up to mid-March 2026:<\/span><\/p>\n<ul data-path-to-node=\"6\">\n<li>\n<p data-path-to-node=\"6,0,0\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b data-path-to-node=\"6,0,0\" data-index-in-node=\"0\">Total Output Executed by Consortium:<\/b> Reached <b data-path-to-node=\"6,0,0\" data-index-in-node=\"45\">VND 1,284.4 billion<\/b>.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"6,1,0\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b data-path-to-node=\"6,1,0\" data-index-in-node=\"0\">Overall Package Completion Rate:<\/b> Reached <b data-path-to-node=\"6,1,0\" data-index-in-node=\"41\">81.31%<\/b>.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"6,2,0\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b data-path-to-node=\"6,2,0\" data-index-in-node=\"0\">Construction Progress:<\/b> Officially <b data-path-to-node=\"6,2,0\" data-index-in-node=\"34\">7 months ahead of schedule<\/b> compared to the contractual timeline.<\/span><\/p>\n<\/li>\n<\/ul>\n<p data-path-to-node=\"7\"><span style=\"font-family: arial, helvetica, sans-serif;\">Achieving a 7-month ahead-of-schedule milestone on a mega-project featuring highly complex technical structures is a rare record. It affirms the project management capabilities, equipment resources, and advanced technical execution standards of Vietnamese contractors.<\/span><\/p>\n<figure id=\"attachment_2951\" aria-describedby=\"caption-attachment-2951\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2951 size-full\" title=\"hinh anh cau phuoc-an-moi-nhat\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-3.webp\" alt=\"hinh anh cau phuoc-an-moi-nhat\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-3.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-3-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-3-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-3-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2951\" class=\"wp-caption-text\">Latest photos of Ph\u01b0\u1edbc An Bridge in March 2026, connecting Phu My (HCMC) with \u0110ong Nai<\/figcaption><\/figure>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"8_Stay_Cables_Tensioned_Moving_Toward_Main_Span_Closure\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">8 Stay Cables Tensioned, Moving Toward Main Span Closure<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-path-to-node=\"10\"><span style=\"font-family: arial, helvetica, sans-serif;\">Core technical items at main tower piers T37 and T38 are being deployed synchronously and with absolute precision:<\/span><\/p>\n<ul data-path-to-node=\"11\">\n<li>\n<p data-path-to-node=\"11,0,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Cable-Stayed System: To date, contractors have successfully installed and tensioned 8 stay cable strands at main tower pier T38. Engineers and workers of Trungnam E&amp;C are urgently preparing to install stay cable No. 9 (S9) in the coming days.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"11,1,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Main Span Construction: Balanced cantilever segment casting is operating at maximum capacity using advanced formtraveler systems. Construction fronts from both main towers are rapidly approaching each other.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"11,2,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Auxiliary &amp; Finishing Items: Parallel to main span development, contractors are expediting the construction of KT stub girders, preparing technical methodologies for main span closure, and finishing the parapet wall structures<\/span><\/p>\n<\/li>\n<\/ul>\n<figure id=\"attachment_2949\" aria-describedby=\"caption-attachment-2949\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2949 size-full\" title=\"hinh anh cau phuoc an-moi-nhat\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-1.webp\" alt=\"hinh anh cau phuoc an-moi-nhat\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-1.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-1-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-1-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/03\/hinh-anh-cau-phuoc-an-moi-nhat-1-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2949\" class=\"wp-caption-text\">Pier T38 where general contractor Trungnam E&amp;C has completed stay cable No. 8<\/figcaption><\/figure>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Phuoc_An_Bridge_Economic_Connector_for_the_Southeast_Region\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">Ph\u01b0\u1edbc An Bridge: Economic Connector for the Southeast Region<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-path-to-node=\"14\"><span style=\"font-family: arial, helvetica, sans-serif;\">Ph\u01b0\u1edbc An Bridge (commenced in June 2023) has a total investment of nearly VND 4,900 billion, a total length of 4.38 km, and a scale of 6 lanes. The highlight of the project is its main span utilizing an extradosed cable-stayed bridge structure with a length of 250 m and a navigation clearance height of 55 m, ensuring safe passage for vessels with capacities up to 30,000 DWT on the Th\u1ecb V\u1ea3i River.<\/span><\/p>\n<p data-path-to-node=\"15\"><span style=\"font-family: arial, helvetica, sans-serif;\">Upon completion, Ph\u01b0\u1edbc An Bridge will play a strategic role:<\/span><\/p>\n<ul data-path-to-node=\"16\">\n<li>\n<p data-path-to-node=\"16,0,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Directly connecting the C\u00e1i M\u00e9p \u2013 Th\u1ecb V\u1ea3i port complex with the B\u1ebfn L\u1ee9c \u2013 Long Th\u00e0nh Expressway and the HCMC \u2013 Long Th\u00e0nh \u2013 D\u1ea7u Gi\u00e2y Expressway.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"16,1,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Shortening freight transportation routes by nearly 30 km from the Mekong Delta region and HCMC to deep-water ports, helping reduce logistics costs by 20\u201330%.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"16,2,0\"><span style=\"font-family: arial, helvetica, sans-serif;\">Relieving severe traffic congestion on the existing National Highway 51.<\/span><\/p>\n<\/li>\n<\/ul>\n<p data-path-to-node=\"17\"><span style=\"font-family: arial, helvetica, sans-serif;\">With current breakthrough construction progress, the seamless coordination of the <a href=\"https:\/\/trungnamec.com.vn\/en\/about-us\/\">Trungnam E&amp;C<\/a> \u2013 Trung Ch\u00ednh contractor consortium is turning the vision of opening the bridge to traffic ahead of schedule into reality, making a significant contribution to infrastructure and economic development across B\u00e0 R\u1ecba \u2013 V\u0169ng T\u00e0u, HCMC, \u0110\u1ed3ng Nai, and the Southern Key Economic Zone.<\/span><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-right kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;right&quot;,&quot;id&quot;:&quot;3617&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;7&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;5&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;5\\\/5 - (7 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;Latest Photos of Ph\u01b0\u1edbc An Bridge 2026&quot;,&quot;width&quot;:&quot;142.5&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 142.5px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            5\/5 - (7 votes)    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>As of March 2026, the mega-project Ph\u01b0\u1edbc An Bridge connecting Ho Chi Minh City and \u0110ong Nai Province is witnessing rapid, continuous progress. Through non-stop day-and-night efforts, the contractor consortium of Trungnam E&amp;C \u2013 Trung Ch\u00ednh has completed 8 stay cables at pier T38 and 7 stay cables at pier T37, progressing 7 months ahead of schedule and bringing the project into its crucial final phase toward main span closure. Over 81% Work Volume Completed in March, 7 Months Ahead of Schedule Ph\u01b0\u1edbc An Bridge Project is undergoing its peak construction period. According to the latest work output report up to mid-March 2026: Total Output Executed by Consortium: Reached VND 1,284.4 billion. Overall Package Completion Rate: Reached 81.31%. Construction Progress: Officially 7 months ahead of schedule compared to the contractual timeline. Achieving a 7-month ahead-of-schedule milestone on a mega-project featuring highly complex technical structures is a rare record. It affirms the project management capabilities, equipment resources, and advanced technical execution standards of Vietnamese contractors. 8 Stay Cables Tensioned, Moving Toward Main Span Closure Core technical items at main tower piers T37 and T38 are being deployed synchronously and with absolute precision: Cable-Stayed System: To date, contractors have successfully installed and tensioned 8 stay cable strands at main tower pier T38. Engineers and workers of Trungnam E&amp;C are urgently preparing to install stay cable No. 9 (S9) in the coming days. Main Span Construction: Balanced cantilever segment casting is operating at maximum capacity using advanced formtraveler systems. Construction fronts from both main towers are rapidly approaching each other. Auxiliary &amp; Finishing Items: Parallel to main span development, contractors are expediting the construction of KT stub girders, preparing technical methodologies for main span closure, and finishing the parapet wall structures Ph\u01b0\u1edbc An Bridge: Economic Connector for the Southeast Region Ph\u01b0\u1edbc An Bridge<\/p>\n","protected":false},"author":3,"featured_media":2948,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[46],"tags":[395,396],"class_list":["post-3617","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","tag-latest-photos-of-phuoc-an-bridge-2026","tag-phuoc-an-bridge-2026"],"acf":[],"_links":{"self":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/3617","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/comments?post=3617"}],"version-history":[{"count":2,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/3617\/revisions"}],"predecessor-version":[{"id":3619,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/3617\/revisions\/3619"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media\/2948"}],"wp:attachment":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media?parent=3617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/categories?post=3617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/tags?post=3617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}