{"id":3553,"date":"2026-08-24T15:22:56","date_gmt":"2026-08-24T08:22:56","guid":{"rendered":"https:\/\/trungnamec.com.vn\/?p=3553"},"modified":"2026-09-17T09:39:07","modified_gmt":"2026-09-17T02:39:07","slug":"construction-progress-of-provincial-road-8-overpass","status":"publish","type":"post","link":"https:\/\/trungnamec.com.vn\/en\/construction-progress-of-provincial-road-8-overpass\/","title":{"rendered":"CONSTRUCTION PROGRESS OF PROVINCIAL ROAD 8 OVERPASS"},"content":{"rendered":"<p style=\"text-align: justify;\"><em><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Currently, <a href=\"https:\/\/www.youtube.com\/watch?v=ZWAf2zhrzKw\" target=\"_blank\" rel=\"noopener\">the Provincial Road 8 Overpass project<\/a> has completed the concrete casting for Pier T03 footing, while auxiliary roads and the drainage system have reached significant progress, laying a solid foundation for the upcoming construction phases.<\/span><\/em><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_74 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/trungnamec.com.vn\/en\/construction-progress-of-provincial-road-8-overpass\/#Focus_on_Superstructure_and_Substructure_Construction\" >Focus on Superstructure and Substructure Construction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/trungnamec.com.vn\/en\/construction-progress-of-provincial-road-8-overpass\/#Strict_Control_of_Quality_Safety_and_Environmental_Compliance\" >Strict Control of Quality, Safety, and Environmental Compliance<\/a><\/li><\/ul><\/nav><\/div>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Focus_on_Superstructure_and_Substructure_Construction\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">Focus on Superstructure and Substructure Construction<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-path-to-node=\"5\"><span style=\"font-family: arial, helvetica, sans-serif;\">Regarding the substructure, 100% of the concrete pouring for Pier T03 footing has been completed, and the structure is currently undergoing technical curing.<\/span><\/p>\n<p data-path-to-node=\"6\"><span style=\"font-family: arial, helvetica, sans-serif;\">For Pier T02, lean concrete blinding and pile head trimming have been finished. Construction crews are now focusing on rebar fabrication, formwork installation, and preparing for inspection prior to footing concrete placement.<\/span><\/p>\n<p data-path-to-node=\"7\"><span style=\"font-family: arial, helvetica, sans-serif;\">Concurrently, the casting yard and gantry crane system for girder fabrication are being completed, ready to meet the scheduled timeline for superstructure execution<\/span><\/p>\n<figure id=\"attachment_3377\" aria-describedby=\"caption-attachment-3377\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3377 size-full\" title=\"tien do cau vuot duong tinh lo-8\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-2.webp\" alt=\"tien do cau vuot duong tinh lo-8\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-2.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-2-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-2-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-2-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-3377\" class=\"wp-caption-text\">Completed concrete casting for Pier T03 footing, lean concrete blinding, and pile head trimming; currently fabricating rebar and installing formwork for Pier T02.<\/figcaption><\/figure>\n<p data-path-to-node=\"9\"><span style=\"font-family: arial, helvetica, sans-serif;\">Temporary Access Roads 1 and 2 have completed aggregate base course laying, facilitating traffic diversion and supporting operations at the project center.<\/span><\/p>\n<p data-path-to-node=\"10\"><span style=\"font-family: arial, helvetica, sans-serif;\">For Parallel Roads 3 and 4, aggregate base course installation has reached approximately 50%, proceeding alongside compaction and subgrade completion.<\/span><\/p>\n<p data-path-to-node=\"11\"><span style=\"font-family: arial, helvetica, sans-serif;\">The longitudinal drainage system is also being expedited. To date, 250 out of 590 meters of drainage ditches have been constructed (~42.4% of total volume), helping proactively manage runoff and safeguard the roadbed structure during construction.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Strict_Control_of_Quality_Safety_and_Environmental_Compliance\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">Strict Control of Quality, Safety, and Environmental Compliance<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-path-to-node=\"13\"><span style=\"font-family: arial, helvetica, sans-serif;\"><a href=\"https:\/\/trungnamec.com.vn\/en\/about-us\/\">Trungnam E&amp;C<\/a> consistently maintains strict compliance with quality control, occupational health and safety, environmental management, and traffic organization standards.<\/span><\/p>\n<p data-path-to-node=\"14\"><span style=\"font-family: arial, helvetica, sans-serif;\">Work items are executed in technical sequence, combined with step-by-step inspections and acceptance testing prior to transitioning to next phases. Fencing, signage, and traffic management are continuously maintained to ensure safety for both local residents and construction crews.<\/span><\/p>\n<figure id=\"attachment_3376\" aria-describedby=\"caption-attachment-3376\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3376 size-full\" title=\"tien do cau vuot duong tinh lo 8\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-1.webp\" alt=\"tien do cau vuot duong tinh lo 8\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-1.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-1-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-1-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2026\/08\/tien-do-cau-vuot-duong-tinh-lo-8-1-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-3376\" class=\"wp-caption-text\">The girder casting yard is being constructed synchronously with other work items<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Moving forward, the Project Management Board will allocate maximum resources to complete Pier T02 footing, advance to pier stem construction, complete Parallel Roads 3 &amp; 4 and the longitudinal drainage system, while preparing essential conditions to commence casting the first precast girders at the yard.<\/span><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-right kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;right&quot;,&quot;id&quot;:&quot;3553&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;CONSTRUCTION PROGRESS OF PROVINCIAL ROAD 8 OVERPASS&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            <span class=\"kksr-muted\">Rate this post<\/span>\n    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>Currently, the Provincial Road 8 Overpass project has completed the concrete casting for Pier T03 footing, while auxiliary roads and the drainage system have reached significant progress, laying a solid foundation for the upcoming construction phases. Focus on Superstructure and Substructure Construction Regarding the substructure, 100% of the concrete pouring for Pier T03 footing has been completed, and the structure is currently undergoing technical curing. For Pier T02, lean concrete blinding and pile head trimming have been finished. Construction crews are now focusing on rebar fabrication, formwork installation, and preparing for inspection prior to footing concrete placement. Concurrently, the casting yard and gantry crane system for girder fabrication are being completed, ready to meet the scheduled timeline for superstructure execution Temporary Access Roads 1 and 2 have completed aggregate base course laying, facilitating traffic diversion and supporting operations at the project center. For Parallel Roads 3 and 4, aggregate base course installation has reached approximately 50%, proceeding alongside compaction and subgrade completion. The longitudinal drainage system is also being expedited. To date, 250 out of 590 meters of drainage ditches have been constructed (~42.4% of total volume), helping proactively manage runoff and safeguard the roadbed structure during construction. Strict Control of Quality, Safety, and Environmental Compliance Trungnam E&amp;C consistently maintains strict compliance with quality control, occupational health and safety, environmental management, and traffic organization standards. Work items are executed in technical sequence, combined with step-by-step inspections and acceptance testing prior to transitioning to next phases. Fencing, signage, and traffic management are continuously maintained to ensure safety for both local residents and construction crews. Moving forward, the Project Management Board will allocate maximum resources to complete Pier T02 footing, advance to pier stem construction, complete Parallel Roads 3 &amp; 4 and the longitudinal drainage system, while preparing essential conditions to commence<\/p>\n","protected":false},"author":3,"featured_media":3378,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[46],"tags":[354],"class_list":["post-3553","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","tag-construction-progress-of-provincial-road-8-overpass"],"acf":[],"_links":{"self":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/3553","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/comments?post=3553"}],"version-history":[{"count":3,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/3553\/revisions"}],"predecessor-version":[{"id":3556,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/3553\/revisions\/3556"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media\/3378"}],"wp:attachment":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media?parent=3553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/categories?post=3553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/tags?post=3553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}