{"id":2817,"date":"2025-12-19T20:29:44","date_gmt":"2025-12-19T13:29:44","guid":{"rendered":"https:\/\/trungnamec.com.vn\/khoi-cong-du-an-hoi-bai-phuoc-tan\/"},"modified":"2025-12-19T21:26:24","modified_gmt":"2025-12-19T14:26:24","slug":"construction-begins-on-the-hoi-bai-phuoc-tan-project","status":"publish","type":"post","link":"https:\/\/trungnamec.com.vn\/en\/construction-begins-on-the-hoi-bai-phuoc-tan-project\/","title":{"rendered":"Construction begins on the Hoi Bai Phuoc Tan project (DT992) project worth nearly 3.7 trillion VND."},"content":{"rendered":"<p style=\"text-align: justify;\"><em><span style=\"font-family: arial, helvetica, sans-serif;\">On the morning of December 19, 2025, the groundbreaking ceremony for the project &#8220;Upgrading and widening Hoi Bai \u2013 Phuoc Tan Road (DT992)&#8221; took place. With a total investment of VND 3,690 billion, this is a strategic project that directly connects National Highway 51 with the Bien Hoa \u2013 Vung Tau Expressway.<\/span><\/em><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_74 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/trungnamec.com.vn\/en\/construction-begins-on-the-hoi-bai-phuoc-tan-project\/#A_crucial_link_in_the_Hoi_Bai_%E2%80%93_Phuoc_Tan_project\" >A crucial link in the Hoi Bai \u2013 Phuoc Tan project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/trungnamec.com.vn\/en\/construction-begins-on-the-hoi-bai-phuoc-tan-project\/#Project_scale_72-meter_cross_section_the_Hoi_Bai_Phuoc_Tan_project\" >Project scale: 72-meter cross section the Hoi Bai Phuoc Tan project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/trungnamec.com.vn\/en\/construction-begins-on-the-hoi-bai-phuoc-tan-project\/#Trungnam_E_Cs_commitment_to_project_excellence\" >Trungnam E&amp;C&#8217;s commitment to project excellence<\/a><\/li><\/ul><\/nav><\/div>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"A_crucial_link_in_the_Hoi_Bai_%E2%80%93_Phuoc_Tan_project\"><\/span><strong><span style=\"font-family: arial, helvetica, sans-serif;\">A crucial link in the Hoi Bai \u2013 Phuoc Tan project<\/span><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">The project starts at the intersection with National Highway 51 (Tan Hai Ward) and ends at the connection point with the Bien Hoa \u2013 Vung Tau Expressway. This route is considered an arterial road, linking to the Eastern North\u2013South Expressway, Ho Chi Minh City&#8217;s Ring Road 4, Long Thanh International Airport, and key economic centers and seaports, while playing a key role in collecting and relieving the immense cargo volume from the Cai Mep \u2013 Thi Vai port complex to the Bien Hoa \u2013 Vung Tau Expressway and vice versa. The commencement of the project not only has significant implications for transport connectivity but also creates a breakthrough driving force for the economic and logistics development of Ba Ria \u2013 Vung Tau Province and the entire Southeast region.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Project_scale_72-meter_cross_section_the_Hoi_Bai_Phuoc_Tan_project\"><\/span><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Project scale: 72-meter cross section the Hoi Bai Phuoc Tan project<\/span><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><b>Key project information:<\/b><\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><b>Project name:<\/b> Upgrading and widening Hoi Bai \u2013 Phuoc Tan Road (DT992), section from National Highway 51 to the Bien Hoa \u2013 Vung Tau Expressway.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><b>Location:<\/b> Tan Hai Ward and Chau Pha Commune, Ba Ria \u2013 Vung Tau Province.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><b>Investor:<\/b> Management Board of Area Transport and Specialized Agricultural Projects of Ba Ria \u2013 Vung Tau Province.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><b>Land area:<\/b> 61.69 ha.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><b>Total investment:<\/b> VND 3,690 billion.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><b>Scale:<\/b> 8.46 km in length, 72 m in width, design speed 80 km\/h.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><b>Main contractor:<\/b> Joint venture between Trungnam E&amp;C and 703 Investment and Construction JSC.<\/span><\/li>\n<\/ul>\n<figure id=\"attachment_2808\" aria-describedby=\"caption-attachment-2808\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2808 size-full\" title=\"Hoi Bai \u2013 Phuoc Tan project\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-3.webp\" alt=\"Hoi Bai \u2013 Phuoc Tan project\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-3.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-3-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-3-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-3-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2808\" class=\"wp-caption-text\">Delegates perform the groundbreaking ceremony for the Hoi Bai &#8211; Phuoc Tan project<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">In addition to the road section, the bridge structures along the route are also comprehensively invested, with a total bridge length of 419.4 m, starting at Km0+000 in the Chau Pha \u2013 Toc Tien intersection area and ending at Km8+458.49 at the connection point with the 991B project. The bridge comprises 10 Super-T girder spans, with a carriageway width of 17.5 m, requiring advanced bridge construction techniques \u2013 an area where Trungnam E&amp;C has outstanding strengths.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Trungnam_E_Cs_commitment_to_project_excellence\"><\/span><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Trungnam E&amp;C&#8217;s commitment to project excellence<\/span><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<figure id=\"attachment_2806\" aria-describedby=\"caption-attachment-2806\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2806 size-full\" title=\"Khoi cong du an hoi-bai-phuoc-tan\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-1.webp\" alt=\"Khoi cong du an hoi-bai-phuoc-tan\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-1.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-1-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-1-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/12\/Khoi-cong-du-an-hoi-bai-phuoc-tan-1-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2806\" class=\"wp-caption-text\">The Trungnam E&amp;C team attended the groundbreaking ceremony<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Building on the success of national key transport projects such as the Hau Giang \u2013 Ca Mau Expressway, <a href=\"https:\/\/www.youtube.com\/watch?v=x48cmWprno4\" target=\"_blank\" rel=\"noopener\">Rach Mieu 2 Bridge<\/a>, and the <a href=\"https:\/\/trungnamec.com.vn\/en\/bien-hoa-vung-tau-expressway\/\">Bien Hoa \u2013 Vung Tau Expressway<\/a>, Trungnam E&amp;C continues to affirm its position as a leading contractor in Vietnam. In response to the investor&#8217;s stringent requirements on schedule and quality, Trungnam E&amp;C is committed to mobilizing maximum resources and equipment, and applying the most advanced bridge and road construction technologies to ensure the project is completed safely, aesthetically, and on schedule.<\/span><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-right kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;right&quot;,&quot;id&quot;:&quot;2817&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;6&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;5&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;5\\\/5 - (6 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;Construction begins on the Hoi Bai Phuoc Tan project (DT992) project worth nearly 3.7 trillion VND.&quot;,&quot;width&quot;:&quot;142.5&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 142.5px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            5\/5 - (6 votes)    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>On the morning of December 19, 2025, the groundbreaking ceremony for the project &#8220;Upgrading and widening Hoi Bai \u2013 Phuoc Tan Road (DT992)&#8221; took place. With a total investment of VND 3,690 billion, this is a strategic project that directly connects National Highway 51 with the Bien Hoa \u2013 Vung Tau Expressway. A crucial link in the Hoi Bai \u2013 Phuoc Tan project The project starts at the intersection with National Highway 51 (Tan Hai Ward) and ends at the connection point with the Bien Hoa \u2013 Vung Tau Expressway. This route is considered an arterial road, linking to the Eastern North\u2013South Expressway, Ho Chi Minh City&#8217;s Ring Road 4, Long Thanh International Airport, and key economic centers and seaports, while playing a key role in collecting and relieving the immense cargo volume from the Cai Mep \u2013 Thi Vai port complex to the Bien Hoa \u2013 Vung Tau Expressway and vice versa. The commencement of the project not only has significant implications for transport connectivity but also creates a breakthrough driving force for the economic and logistics development of Ba Ria \u2013 Vung Tau Province and the entire Southeast region. Project scale: 72-meter cross section the Hoi Bai Phuoc Tan project Key project information: Project name: Upgrading and widening Hoi Bai \u2013 Phuoc Tan Road (DT992), section from National Highway 51 to the Bien Hoa \u2013 Vung Tau Expressway. Location: Tan Hai Ward and Chau Pha Commune, Ba Ria \u2013 Vung Tau Province. Investor: Management Board of Area Transport and Specialized Agricultural Projects of Ba Ria \u2013 Vung Tau Province. Land area: 61.69 ha. Total investment: VND 3,690 billion. Scale: 8.46 km in length, 72 m in width, design speed 80 km\/h. Main contractor: Joint venture between Trungnam E&amp;C and 703 Investment and Construction JSC. In addition to the<\/p>\n","protected":false},"author":3,"featured_media":2811,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[45],"tags":[274,275,273,270,271,272],"class_list":["post-2817","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology-news","tag-hoi-bai-phuoc-tan-project","tag-construction-begins-on-the-hoi-bai-phuoc-tan-project","tag-le-khoi-cong-mo-rong-duong-hoi-bai-phuoc-tan-en","tag-duong-hoi-bai-phuoc-tan-khoi-cong-en","tag-khoi-cong-du-an-hoi-bai-phuoc-tan-en","tag-du-an-hoi-bai-phuoc-tan-dt992-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2817"}],"version-history":[{"count":3,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2817\/revisions"}],"predecessor-version":[{"id":2820,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2817\/revisions\/2820"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media\/2811"}],"wp:attachment":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}