{"id":2341,"date":"2025-09-04T19:18:57","date_gmt":"2025-09-04T12:18:57","guid":{"rendered":"https:\/\/trungnamec.com.vn\/?p=2341"},"modified":"2025-09-04T19:40:00","modified_gmt":"2025-09-04T12:40:00","slug":"phuoc-an-bridge-first-stay-cable-bundle-tensioning","status":"publish","type":"post","link":"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-first-stay-cable-bundle-tensioning\/","title":{"rendered":"Phuoc An Bridge: First Stay Cable Bundle Tensioning"},"content":{"rendered":"<p><span style=\"font-family: arial, helvetica, sans-serif;\">Phuoc An Bridge&#8217;s Cable Stay No. 1 Tensioning September 4, 2025 \u2013 According to the Ba Ria &#8211; Vung Tau Province Department of Transportation and Agricultural Projects Management Board and a consortium of contractors, the first cable stay tensioning ceremony for cable stay No. 1 took place at tower T38, part of package No. 39.<\/span><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_74 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-first-stay-cable-bundle-tensioning\/#I_Phuoc_An_Bridge_%E2%80%93_Connecting_Ho_Chi_Minh_City_and_Dong_Nai_Province\" >I. Phuoc An Bridge &#8211; Connecting Ho Chi Minh City and Dong Nai Province<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-first-stay-cable-bundle-tensioning\/#II_Tensioning_Cable_Stay_No_1_A_Challenging_Technical_Milestone\" >II. Tensioning Cable Stay No. 1: A Challenging Technical Milestone<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-first-stay-cable-bundle-tensioning\/#1_The_Importance_of_Cable_Stays\" >1. The Importance of Cable Stays<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-first-stay-cable-bundle-tensioning\/#2_First_Cable_Stay_Tensioning_Event_at_Tower_T38\" >2. First Cable Stay Tensioning Event at Tower T38<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-first-stay-cable-bundle-tensioning\/#3_Phuoc_An_Bridge_Progress_and_Breakthrough_Timeline\" >3. Phuoc An Bridge Progress and Breakthrough Timeline<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-first-stay-cable-bundle-tensioning\/#III_The_Vision_to_Build_Iconic_Structures\" >III. The Vision to Build Iconic Structures<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"I_Phuoc_An_Bridge_%E2%80%93_Connecting_Ho_Chi_Minh_City_and_Dong_Nai_Province\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">I. Phuoc An Bridge &#8211; Connecting Ho Chi Minh City and Dong Nai Province<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">With a total investment of nearly 4.9 trillion VND, the Phuoc An Bridge project is a key transportation infrastructure project with strategic importance for the economic development of the Southern Key Economic Region. The bridge is designed to be approximately 4.3 km long with six lanes, spanning the Thi Vai River to connect Ho Chi Minh City with Dong Nai Province.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Once completed, the <a href=\"https:\/\/www.tiktok.com\/@trungnam_ec\/video\/7496883382664580359\" target=\"_blank\" rel=\"noopener\">Phuoc An Bridge<\/a> will be crucial, directly connecting the Cai Mep \u2013 Thi Vai port system, one of the largest port clusters in the country, to the Ben Luc \u2013 Long Thanh Expressway. This will significantly reduce the distance and time for freight transport, lower logistics costs, and promote the regional supply chain, thereby enhancing the competitiveness of the entire Southern region.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">As the key contractor for Package XL-39 \u2013 the main cable-stayed bridge, Trungnam E&amp;C has demonstrated professionalism and superior experience in managing and coordinating complex construction items.<\/span><\/p>\n<figure id=\"attachment_2339\" aria-describedby=\"caption-attachment-2339\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2339 size-full\" title=\"Phuoc An Bridge: First Stay Cable Bundle Tensioning\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-7.webp\" alt=\"Phuoc An Bridge: First Stay Cable Bundle Tensioning\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-7.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-7-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-7-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-7-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2339\" class=\"wp-caption-text\">Phuoc An Bridge Project, with a total investment capacity of nearly 4,900 billion VND<\/figcaption><\/figure>\n<h2><span class=\"ez-toc-section\" id=\"II_Tensioning_Cable_Stay_No_1_A_Challenging_Technical_Milestone\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">II. Tensioning Cable Stay No. 1: A Challenging Technical Milestone<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"1_The_Importance_of_Cable_Stays\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">1. The Importance of Cable Stays<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Cable stays are a core structural element, playing the most crucial role in the structural system of a cable-stayed bridge. Instead of relying solely on the bridge deck to bear the load, cable stays distribute the deck&#8217;s load to the cable bundles and transfer the tensile force to the main towers. The successful tensioning of the cable bundles is not just a task; it&#8217;s a confirmation of the entire selected technical process and methodology. A minor mistake could lead to safety issues, reduced lifespan, and serious damage to the structure.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_First_Cable_Stay_Tensioning_Event_at_Tower_T38\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">2. First Cable Stay Tensioning Event at Tower T38<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">On September 4, 2025, with the participation of Mr. Nguyen Van Tho, Vice Chairman of the Ho Chi Minh City People&#8217;s Committee, Trungnam E&amp;C officially proceeded with the tensioning of the first cable stay at tower T38, setting a solid foundation for the deployment of the remaining cable bundles.<\/span><\/p>\n<figure id=\"attachment_2335\" aria-describedby=\"caption-attachment-2335\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2335 size-full\" title=\"Phuoc An Bridge: First Stay Cable Bundle Tensioning\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-3.webp\" alt=\"Phuoc An Bridge: First Stay Cable Bundle Tensioning\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-3.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-3-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-3-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-3-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2335\" class=\"wp-caption-text\">Mr. Nguyen Van Tho &#8211; Vice Chairman of Ho Chi Minh City People&#8217;s Committee, attended the No. 1 cable tensioning ceremony<\/figcaption><\/figure>\n<h3><span class=\"ez-toc-section\" id=\"3_Phuoc_An_Bridge_Progress_and_Breakthrough_Timeline\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">3. Phuoc An Bridge Progress and Breakthrough Timeline<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Thanks to the relentless efforts of <a href=\"https:\/\/trungnamec.com.vn\/en\/about-us\/\">Trungnam E&amp;C<\/a> and the entire contractor consortium, the project&#8217;s progress is being maintained at an impressive pace. An August 2025 progress update from the site shows:<\/span><\/p>\n<ul>\n<li>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Total Consortium Output:<\/b> Has reached 969.484 billion VND, equivalent to 61.37% of the total contract value.<\/span><\/p>\n<\/li>\n<li>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Trungnam E&amp;C&#8217;s Output:<\/b> Has reached 54.83% of their contracted value, with a performance exceeding the plan by 219.58% in August 2025.<\/span><\/p>\n<\/li>\n<li>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Tower T38 (Trungnam E&amp;C):<\/b> Has completed the concrete pouring for block K8 and has tensioned the first cable stay.<\/span><\/p>\n<\/li>\n<li>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Tower T37 (Trungnam E&amp;C):<\/b> Has completed the shaft for segment D6 and is currently constructing segment D7.<\/span><\/p>\n<\/li>\n<li>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Tower T39 (Trung Chinh):<\/b> Has completed the concrete pouring for block K6 and is currently constructing block K7.<\/span><\/p>\n<\/li>\n<\/ul>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">These figures are clear evidence of a strict, disciplined, and professional project management process, ensuring the project will continue its momentum to be completed on schedule in 2027.<\/span><\/p>\n<figure id=\"attachment_2334\" aria-describedby=\"caption-attachment-2334\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2334 size-full\" title=\"Phuoc An Bridge: First Stay Cable Bundle Tensioning\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-2.webp\" alt=\"Phuoc An Bridge: First Stay Cable Bundle Tensioning\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-2.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-2-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-2-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/09\/cau-phuoc-an-cang-cap-vang-so-1-2-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2334\" class=\"wp-caption-text\">Stay cable bundle No. 1 is stretched at Phuoc An Bridge project<\/figcaption><\/figure>\n<h2><span class=\"ez-toc-section\" id=\"III_The_Vision_to_Build_Iconic_Structures\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\">III. The Vision to Build Iconic Structures<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">With extensive experience from a series of other key transportation and renewable energy infrastructure projects across the country, Trungnam E&amp;C has affirmed its position as one of the leading general contractors. Its ability to apply advanced technology, flexibility in problem-solving, and commitment to quality and safety are key factors that contribute to the company&#8217;s success.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The Phuoc An Bridge will be a new symbol, affirming the stature of Vietnam&#8217;s construction industry. Trungnam E&amp;C is proud to be a part of this journey, contributing to the nation&#8217;s shared prosperity.<\/span><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-right kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;right&quot;,&quot;id&quot;:&quot;2341&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;Phuoc An Bridge: First Stay Cable Bundle Tensioning&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            <span class=\"kksr-muted\">Rate this post<\/span>\n    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>Phuoc An Bridge&#8217;s Cable Stay No. 1 Tensioning September 4, 2025 \u2013 According to the Ba Ria &#8211; Vung Tau Province Department of Transportation and Agricultural Projects Management Board and a consortium of contractors, the first cable stay tensioning ceremony for cable stay No. 1 took place at tower T38, part of package No. 39. I. Phuoc An Bridge &#8211; Connecting Ho Chi Minh City and Dong Nai Province With a total investment of nearly 4.9 trillion VND, the Phuoc An Bridge project is a key transportation infrastructure project with strategic importance for the economic development of the Southern Key Economic Region. The bridge is designed to be approximately 4.3 km long with six lanes, spanning the Thi Vai River to connect Ho Chi Minh City with Dong Nai Province. Once completed, the Phuoc An Bridge will be crucial, directly connecting the Cai Mep \u2013 Thi Vai port system, one of the largest port clusters in the country, to the Ben Luc \u2013 Long Thanh Expressway. This will significantly reduce the distance and time for freight transport, lower logistics costs, and promote the regional supply chain, thereby enhancing the competitiveness of the entire Southern region. As the key contractor for Package XL-39 \u2013 the main cable-stayed bridge, Trungnam E&amp;C has demonstrated professionalism and superior experience in managing and coordinating complex construction items. II. Tensioning Cable Stay No. 1: A Challenging Technical Milestone 1. The Importance of Cable Stays Cable stays are a core structural element, playing the most crucial role in the structural system of a cable-stayed bridge. Instead of relying solely on the bridge deck to bear the load, cable stays distribute the deck&#8217;s load to the cable bundles and transfer the tensile force to the main towers. The successful tensioning of the cable bundles is not just a<\/p>\n","protected":false},"author":3,"featured_media":2332,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[46],"tags":[218,213],"class_list":["post-2341","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","tag-phuoc-an-bridge-first-stay-cable-bundle-tensioning","tag-phuoc-an-bridge"],"acf":[],"_links":{"self":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2341"}],"version-history":[{"count":1,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2341\/revisions"}],"predecessor-version":[{"id":2342,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2341\/revisions\/2342"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media\/2332"}],"wp:attachment":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}