{"id":2320,"date":"2025-08-29T09:22:29","date_gmt":"2025-08-29T02:22:29","guid":{"rendered":"https:\/\/trungnamec.com.vn\/?p=2320"},"modified":"2025-08-29T09:36:49","modified_gmt":"2025-08-29T02:36:49","slug":"phuoc-an-bridge-progress","status":"publish","type":"post","link":"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-progress\/","title":{"rendered":"Latest Images of Phuoc An Bridge Progress Reaching 61% of Production Value"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\">With a total investment of <\/span><b>4,879 billion VND<\/b><span style=\"font-weight: 400;\">, Phuoc An Bridge plays a crucial role in connecting the Cai Mep \u2013 Thi Vai international port system with key expressways and major industrial parks in Dong Nai, Ho Chi Minh City, and Ba Ria \u2013 Vung Tau, contributing to enhancing the international competitiveness of Vietnam&#8217;s seaport system.<\/span><\/span><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_74 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-progress\/#I_Latest_Construction_Progress_Update_of_Phuoc_An_Bridge\" >I. Latest Construction Progress Update of Phuoc An Bridge<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-progress\/#1_Progress_of_Main_Packages\" >1. Progress of Main Packages<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-progress\/#2_Construction_Milestones_for_Main_Bridge_Components_August_2025\" >2. Construction Milestones for Main Bridge Components (August 2025)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-progress\/#3_Outstanding_Performance_of_Trungnam_E_C\" >3. Outstanding Performance of Trungnam E&amp;C<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-progress\/#4_Significance_of_the_August_Milestone\" >4. Significance of the August Milestone<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-progress\/#II_Trungnam_E_C_%E2%80%93_Affirming_its_Position_as_a_Leading_General_Contractor\" >II. Trungnam E&amp;C \u2013 Affirming its Position as a Leading General Contractor<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/trungnamec.com.vn\/en\/phuoc-an-bridge-progress\/#III_Strategic_Importance_of_Phuoc_An_Bridge\" >III. Strategic Importance of Phuoc An Bridge<\/a><\/li><\/ul><\/nav><\/div>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"I_Latest_Construction_Progress_Update_of_Phuoc_An_Bridge\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>I. Latest Construction Progress Update of Phuoc An Bridge<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">The progress of <a href=\"https:\/\/www.tiktok.com\/@trungnam_ec\/video\/7496883382664580359?q=trungnam_ec&amp;t=1756433427117\" target=\"_blank\" rel=\"noopener\">Phuoc An Bridge<\/a> is being actively implemented, with clear milestones across various packages.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"1_Progress_of_Main_Packages\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>1. Progress of Main Packages<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Package No. 38:<\/b><\/span>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\">Production value reached over 574 billion VND, equivalent to <\/span><b>59% of the contract value<\/b><span style=\"font-weight: 400;\">.<\/span><\/span><\/li>\n<\/ul>\n<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Package No. 39 (Main cable-stayed bridge &#8211; constructed by Trungnam E&amp;C):<\/b><\/span>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Trungnam E&amp;C:<\/b><span style=\"font-weight: 400;\"> Achieved cumulative production value of <\/span><b>547 billion VND<\/b><span style=\"font-weight: 400;\">, equivalent to <\/span><b>54.83%<\/b><span style=\"font-weight: 400;\"> of its assigned contract value.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Trung Chinh:<\/b><span style=\"font-weight: 400;\"> Achieved cumulative production value of <\/span><b>422 billion VND<\/b><span style=\"font-weight: 400;\">, equivalent to <\/span><b>72.58%<\/b><span style=\"font-weight: 400;\"> of its assigned contract value.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Total joint venture production:<\/b><span style=\"font-weight: 400;\"> Reached <\/span><b>969.484 billion VND<\/b><span style=\"font-weight: 400;\">, equivalent to <\/span><b>61.37%<\/b><span style=\"font-weight: 400;\"> of the total contract value.<\/span><\/span><\/li>\n<\/ul>\n<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Packages No. 40 and 41:<\/b><\/span>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Facing many difficulties due to obstacles in site clearance (GPMB) and a shortage of backfill materials.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"2_Construction_Milestones_for_Main_Bridge_Components_August_2025\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>2. Construction Milestones for Main Bridge Components (August 2025)<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Trungnam E&amp;C is accelerating rapidly, as shown by important detailed progress:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Pier T37:<\/b><span style=\"font-weight: 400;\"> Completed construction of pier shaft segment D6 and is continuing with segment D7.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Pier T38:<\/b><span style=\"font-weight: 400;\"> Completed pouring block K8. Notably, the <\/span><b>first cable-staying tensioning<\/b><span style=\"font-weight: 400;\"> is scheduled to be implemented on <\/span><b>August 30, 2025<\/b><span style=\"font-weight: 400;\">, a groundbreaking technical event for the project.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Pier T39:<\/b><span style=\"font-weight: 400;\"> Completed pouring block K6 and is continuing with block K7.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Pier T40:<\/b><span style=\"font-weight: 400;\"> Completed construction of pier shaft segment D6 and is continuing with segment D7.<\/span><\/span><\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"3_Outstanding_Performance_of_Trungnam_E_C\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>3. Outstanding Performance of Trungnam E&amp;C<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\">In August 2025, Trungnam E&amp;C recorded impressive construction performance: achieving an actual production value of <\/span><b>16.85 billion VND<\/b><span style=\"font-weight: 400;\">, equivalent to <\/span><b>219.58%<\/b><span style=\"font-weight: 400;\"> of the planned target. This achievement is clear evidence of Trungnam E&amp;C&#8217;s proactiveness, determination, and effective resource coordination, ensuring the project remains on track despite numerous challenges.<\/span><\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"4_Significance_of_the_August_Milestone\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>4. Significance of the August Milestone<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\">The preparation for the <\/span><b>first cable-staying tensioning at Pier T38<\/b><span style=\"font-weight: 400;\"> is not only a significant technical milestone but also a testament to the determination and capability of the engineering and labor teams. Once the stay cables are successfully installed, the project will gradually enter the closure phase \u2013 one of the most complex components in cable-stayed bridge construction.<\/span><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">This is also the moment the project affirms its ahead-of-schedule construction pace, demonstrating close coordination among the investor, supervisory consultant, and joint venture contractors.<\/span><\/p>\n<figure id=\"attachment_2315\" aria-describedby=\"caption-attachment-2315\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2315 size-full\" title=\"Phuoc An Bridge Progress\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an-moi_nhat.webp\" alt=\"Phuoc An Bridge Progress\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an-moi_nhat.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an-moi_nhat-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an-moi_nhat-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an-moi_nhat-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2315\" class=\"wp-caption-text\">Pier T38: Completed pouring block K8. Notably, the first cable-staying tensioning is scheduled to be implemented on August 30, 2025<\/figcaption><\/figure>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"II_Trungnam_E_C_%E2%80%93_Affirming_its_Position_as_a_Leading_General_Contractor\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>II. Trungnam E&amp;C \u2013 Affirming its Position as a Leading General Contractor<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\">With over 17 years of establishment and development, <\/span><b>Trungnam E&amp;C<\/b><span style=\"font-weight: 400;\"> has become one of Vietnam&#8217;s leading general contractors for construction and infrastructure. The company has made its mark through a series of major ongoing projects.<\/span><\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Expressway routes<\/b><span style=\"font-weight: 400;\"> (<a href=\"https:\/\/trungnamec.com.vn\/en\/chau-doc-can-tho-soc-trang-expressway-progress-2025\/\">Chau Doc \u2013 Can Tho \u2013 Soc Trang Phase 1<\/a>, Khanh Hoa \u2013 Buon Ma Thuot, Hau Giang &#8211; Ca Mau, Bien Hoa &#8211; Vung Tau).<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Inauguration of Rach Mieu 2 Bridge on August 19, 2025<\/b><span style=\"font-weight: 400;\"> \u2013 one of the large-scale cable-stayed bridges in the Mekong Delta.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Dai Ngai 1 Bridge:<\/b><span style=\"font-weight: 400;\"> Construction of bridge structures and approach roads at both ends.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Binh Goi Bridge:<\/b><span style=\"font-weight: 400;\"> Construction of Binh Goi Bridge from Km51+280 to Km52+580.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Nguyen Trai Bridge:<\/b><span style=\"font-weight: 400;\"> Construction of the main cable-stayed bridge belonging to component project 1, construction of works belonging to the investment project for Nguyen Trai Bridge and urban regeneration of the surrounding area.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Gia Binh International Airport:<\/b><span style=\"font-weight: 400;\"> Construction of ground leveling items, serving drainage for the flight area.<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b>Numerous renewable energy and industrial park infrastructure projects.<\/b><\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Taking on the main components of Phuoc An Bridge once again affirms <a href=\"https:\/\/trungnamec.com.vn\/en\/about-us\/\">Trungnam E&amp;C&#8217;s<\/a> capability in executing projects requiring complex engineering, large construction volumes, and urgent deadlines.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">With its experience, modern technology, and high sense of responsibility, Trungnam E&amp;C is committed to ensuring the safety, quality, and progress of the work.<\/span><\/p>\n<figure id=\"attachment_2314\" aria-describedby=\"caption-attachment-2314\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2314 size-full\" title=\"Phuoc An Bridge Progress\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an_moi_nhat.webp\" alt=\"Phuoc An Bridge Progress\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an_moi_nhat.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an_moi_nhat-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an_moi_nhat-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/Tien-do-cau-phuoc-an_moi_nhat-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2314\" class=\"wp-caption-text\">Trungnam E&amp;C&#8217;s output by August 2025 reached 55%<\/figcaption><\/figure>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"III_Strategic_Importance_of_Phuoc_An_Bridge\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>III. Strategic Importance of Phuoc An Bridge<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Upon completion, Phuoc An Bridge will create a new route for goods from Ba Ria-Vung Tau to the Eastern and Western provinces and vice versa, directly connecting the Cai Mep &#8211; Thi Vai port system with key expressways. This project plays a strategic role in completing the logistics network of the Southern key economic region, promoting trade, tourism, and creating sustainable economic momentum for the entire region.<\/span><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-right kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;right&quot;,&quot;id&quot;:&quot;2320&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;Latest Images of Phuoc An Bridge Progress Reaching 61% of Production Value&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            <span class=\"kksr-muted\">Rate this post<\/span>\n    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>With a total investment of 4,879 billion VND, Phuoc An Bridge plays a crucial role in connecting the Cai Mep \u2013 Thi Vai international port system with key expressways and major industrial parks in Dong Nai, Ho Chi Minh City, and Ba Ria \u2013 Vung Tau, contributing to enhancing the international competitiveness of Vietnam&#8217;s seaport system. I. Latest Construction Progress Update of Phuoc An Bridge The progress of Phuoc An Bridge is being actively implemented, with clear milestones across various packages. 1. Progress of Main Packages Package No. 38: Production value reached over 574 billion VND, equivalent to 59% of the contract value. Package No. 39 (Main cable-stayed bridge &#8211; constructed by Trungnam E&amp;C): Trungnam E&amp;C: Achieved cumulative production value of 547 billion VND, equivalent to 54.83% of its assigned contract value. Trung Chinh: Achieved cumulative production value of 422 billion VND, equivalent to 72.58% of its assigned contract value. Total joint venture production: Reached 969.484 billion VND, equivalent to 61.37% of the total contract value. Packages No. 40 and 41: Facing many difficulties due to obstacles in site clearance (GPMB) and a shortage of backfill materials. 2. Construction Milestones for Main Bridge Components (August 2025) Trungnam E&amp;C is accelerating rapidly, as shown by important detailed progress: Pier T37: Completed construction of pier shaft segment D6 and is continuing with segment D7. Pier T38: Completed pouring block K8. Notably, the first cable-staying tensioning is scheduled to be implemented on August 30, 2025, a groundbreaking technical event for the project. Pier T39: Completed pouring block K6 and is continuing with block K7. Pier T40: Completed construction of pier shaft segment D6 and is continuing with segment D7. 3. Outstanding Performance of Trungnam E&amp;C In August 2025, Trungnam E&amp;C recorded impressive construction performance: achieving an actual production value of 16.85 billion VND,<\/p>\n","protected":false},"author":3,"featured_media":2313,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[46],"tags":[210,211,212,213],"class_list":["post-2320","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","tag-phuoc-an-bridge-progress","tag-phuoc-an-bridge-construction","tag-latest-progress","tag-phuoc-an-bridge"],"acf":[],"_links":{"self":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2320"}],"version-history":[{"count":1,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2320\/revisions"}],"predecessor-version":[{"id":2321,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2320\/revisions\/2321"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media\/2313"}],"wp:attachment":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}