{"id":2308,"date":"2025-08-07T09:48:23","date_gmt":"2025-08-07T02:48:23","guid":{"rendered":"https:\/\/trungnamec.com.vn\/lap-dat-dam-cau-xang-lai-hieu\/"},"modified":"2025-08-29T09:39:05","modified_gmt":"2025-08-29T02:39:05","slug":"xang-lai-hieu-bridge-girder-installation","status":"publish","type":"post","link":"https:\/\/trungnamec.com.vn\/en\/xang-lai-hieu-bridge-girder-installation\/","title":{"rendered":"Xang Lai Hieu Bridge Girder Installation: On the Chau Doc \u2013 Can Tho \u2013 Soc Trang Expressway"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\"><b><i>The Xang Lai Hieu Bridge, a key component of the Chau Doc \u2013 Can Tho \u2013 Soc Trang Expressway, is 500m long with a total investment of 160 billion VND. Girder installation is almost complete.<\/i><\/b><\/span><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_74 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/trungnamec.com.vn\/en\/xang-lai-hieu-bridge-girder-installation\/#I_Xang_Lai_Hieu_Bridge_A_%E2%80%9CBreakthrough%E2%80%9D_Key_Component_on_the_Expressway\" >I. Xang Lai Hieu Bridge: A &#8220;Breakthrough&#8221; Key Component on the Expressway<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/trungnamec.com.vn\/en\/xang-lai-hieu-bridge-girder-installation\/#1_Location_of_Xang_Lai_Hieu_Bridge\" >1. Location of Xang Lai Hieu Bridge<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/trungnamec.com.vn\/en\/xang-lai-hieu-bridge-girder-installation\/#2_Xang_Lai_Hieu_Bridge_Girder_Installation_August_2025\" >2. Xang Lai Hieu Bridge Girder Installation (August 2025)<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/trungnamec.com.vn\/en\/xang-lai-hieu-bridge-girder-installation\/#II_General_Contractor_Capacity_for_Transport_Infrastructure_Construction\" >II. General Contractor Capacity for Transport Infrastructure Construction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/trungnamec.com.vn\/en\/xang-lai-hieu-bridge-girder-installation\/#III_Chau_Doc_%E2%80%93_Can_Tho_%E2%80%93_Soc_Trang_Expressway_Project\" >III. Chau Doc \u2013 Can Tho \u2013 Soc Trang Expressway Project<\/a><\/li><\/ul><\/nav><\/div>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"I_Xang_Lai_Hieu_Bridge_A_%E2%80%9CBreakthrough%E2%80%9D_Key_Component_on_the_Expressway\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>I. Xang Lai Hieu Bridge: A &#8220;Breakthrough&#8221; Key Component on the Expressway<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"1_Location_of_Xang_Lai_Hieu_Bridge\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>1. Location of Xang Lai Hieu Bridge<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\">The Xang Lai Hieu Bridge is being built at kilometer marker Km122+049.80 on the Chau Doc \u2013 Can Tho \u2013 Soc Trang Expressway. The bridge is 500m long with a total investment of 160 billion VND.<\/span> \u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The timely completion of the Xang Lai Hieu Bridge will significantly contribute to effectively connecting key areas of Hau Giang province with neighboring provinces, facilitating trade, goods transportation, and promoting local socio-economic development.<\/span><\/p>\n<figure id=\"attachment_2218\" aria-describedby=\"caption-attachment-2218\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2218 size-full\" title=\"Xang Lai Hieu Bridge Girder Installation\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-2.webp\" alt=\"Xang Lai Hieu Bridge Girder Installation\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-2.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-2-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-2-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-2-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2218\" class=\"wp-caption-text\">Trungnam E&amp;C completed 9 out of 12 bridge spans, continuing to affirm its breakthrough efforts.<\/figcaption><\/figure>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"2_Xang_Lai_Hieu_Bridge_Girder_Installation_August_2025\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>2. Xang Lai Hieu Bridge Girder Installation (August 2025)<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Construction progress in August 2025 has shown Trungnam E&amp;C&#8217;s high level of focus to meet the set objectives.<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\"><strong>Girder Installation:<\/strong> The installation of Xang Lai Hieu Bridge girders is being urgently carried out, with 63 out of 84 girders installed (each weighing 80 tons), completing 9 out of a total of 12 bridge spans, further affirming the breakthrough effort. \u00a0<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\"><strong>Crossbeam and Deck Slab Construction:<\/strong> In parallel with girder installation, Trungnam E&amp;C is actively implementing the construction of crossbeams and deck slabs. These are important items to complete the superstructure, creating the road surface for vehicles. \u00a0<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\"><strong>T5, T6 Pier Cap Construction:<\/strong> The construction of T5 and T6 pier caps has been actively implemented, creating a solid foundation for girder installation. <\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\"><strong>Other Items:<\/strong> In addition, roadbed construction, soft soil treatment using CDM piles and wick drains, and culvert construction are also being carried out in the Km120+200-Km122+580 area. \u00a0<\/span><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\"><strong>Quality Control:<\/strong> Trungnam E&amp;C always prioritizes strict inspection and testing such as frequency testing of galvanized mesh thickness, precast concrete barriers, roadbed compaction testing, and mass CDM pile core drilling to ensure project quality and safety. \u00a0<\/span><\/span><\/li>\n<\/ul>\n<figure id=\"attachment_2219\" aria-describedby=\"caption-attachment-2219\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2219 size-full\" title=\"Xang Lai Hieu Bridge Girder Installation\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-3.webp\" alt=\"Xang Lai Hieu Bridge Girder Installation\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-3.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-3-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-3-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-3-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2219\" class=\"wp-caption-text\">The bridge is 500m long and has a total investment of 160 billion VND.<\/figcaption><\/figure>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"II_General_Contractor_Capacity_for_Transport_Infrastructure_Construction\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>II. General Contractor Capacity for Transport Infrastructure Construction<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><a href=\"https:\/\/trungnamec.com.vn\/en\/about-us\/\">Trungnam E&amp;C<\/a>, with over 15 years of experience, has affirmed its position as one of the leading general contractors in transport infrastructure construction in Vietnam.<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><strong>Experience:<\/strong> Leading EPC, EC, PC general contractor in Vietnam.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><strong>Typical Transport Projects:<\/strong> Trungnam E&amp;C has made a strong mark through a series of other key transport projects nationwide, demonstrating diverse capabilities and adaptability to various complex types of structures:<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><a href=\"https:\/\/www.youtube.com\/watch?v=x48cmWprno4\" target=\"_blank\" rel=\"noopener\"><strong>Rach Mieu 2 Bridge:<\/strong><\/a> Key joint venture general contractor, 100% volume achieved, technical opening scheduled for August 2025.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><strong>Nguyen Trai Bridge (Hai Phong):<\/strong> Member of the joint venture that won Package No. 14 for the construction of the cable-stayed main bridge (2,449.5 billion VND), expected to be completed in 2027.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><strong>Phuoc An Bridge:<\/strong> Leading contractor of joint venture for Package XL-39 (cable-stayed main bridge, 1,803 billion VND), T38 pier reaching 14\/15 tower segments.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><strong>Khanh Hoa \u2013 Buon Ma Thuot Expressway:<\/strong> Participating in Package No. 03 for the construction of the section from Km101+500 \u2013 Km117+593. Contract value 1,467.32 billion VND.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\"><strong>Bien Hoa \u2013 Vung Tau Expressway:<\/strong> Package No. 18 (construction) Construction of the section from Km0+000 \u2013 Km6+200 (196.59 billion VND). <\/span><\/span><\/li>\n<\/ul>\n<figure id=\"attachment_2217\" aria-describedby=\"caption-attachment-2217\" style=\"width: 1200px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2217 size-full\" title=\"Xang Lai Hieu Bridge Girder Installation\" src=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-1.webp\" alt=\"Xang Lai Hieu Bridge Girder Installation\" width=\"1200\" height=\"628\" srcset=\"https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-1.webp 1200w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-1-300x157.webp 300w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-1-1024x536.webp 1024w, https:\/\/trungnamec.com.vn\/wp-content\/uploads\/2025\/08\/lap-dam-cau-xang-lai-hieu-1-768x402.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption id=\"caption-attachment-2217\" class=\"wp-caption-text\">Installation of 63\/84 beam slabs (each slab weighs 80 tons)<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><span style=\"font-weight: 400;\">Commitment to quality, strict adherence to design documents, technical standards, and current procedures and regulations.<\/span> \u00a0<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"III_Chau_Doc_%E2%80%93_Can_Tho_%E2%80%93_Soc_Trang_Expressway_Project\"><\/span><span style=\"font-family: arial, helvetica, sans-serif;\"><b>III. Chau Doc \u2013 Can Tho \u2013 Soc Trang Expressway Project<\/b><\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\"><a href=\"https:\/\/trungnamec.com.vn\/en\/chau-doc-can-tho-soc-trang-expressway-progress-2025\/\">The Chau Doc \u2013 Can Tho \u2013 Soc Trang Expressway<\/a> investment and construction project, Phase 1, is one of the national key transport projects, holding special strategic significance for the comprehensive development of the Mekong Delta region. Total length: 188.2 km, passing through 4 provinces and cities: An Giang, Can Tho City, Hau Giang, and Soc Trang.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Scale: 4 lanes, design speed 100 km\/h.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Total Investment: 44,691 billion VND.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Commencement Date: November 2023.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Completion Target: Expected to complete the entire route in 2026 and be put into synchronous operation in 2027. Trungnam E&amp;C is committed to completing its package by July 2026.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Trungnam E&amp;C is the leading contractor of the joint venture constructing Package No. 02 (section from Km113+200 \u2013 Km131+082) and Package No. 09 (section from Km131+300 \u2013 Km144+500) belonging to Sub-projects 3 and 4. Current progress has reached 39%. We are still maintaining 3-shift construction continuously to bring the project to completion on schedule as directed by the Prime Minister by December 19, 2025, for basic traffic opening of the entire route.<\/span><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-right kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;right&quot;,&quot;id&quot;:&quot;2308&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;3&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;5&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;5\\\/5 - (3 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;Xang Lai Hieu Bridge Girder Installation: On the Chau Doc \u2013 Can Tho \u2013 Soc Trang Expressway&quot;,&quot;width&quot;:&quot;142.5&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 142.5px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            5\/5 - (3 votes)    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Xang Lai Hieu Bridge, a key component of the Chau Doc \u2013 Can Tho \u2013 Soc Trang Expressway, is 500m long with a total investment of 160 billion VND. Girder installation is almost complete. I. Xang Lai Hieu Bridge: A &#8220;Breakthrough&#8221; Key Component on the Expressway 1. Location of Xang Lai Hieu Bridge The Xang Lai Hieu Bridge is being built at kilometer marker Km122+049.80 on the Chau Doc \u2013 Can Tho \u2013 Soc Trang Expressway. The bridge is 500m long with a total investment of 160 billion VND. \u00a0 The timely completion of the Xang Lai Hieu Bridge will significantly contribute to effectively connecting key areas of Hau Giang province with neighboring provinces, facilitating trade, goods transportation, and promoting local socio-economic development. 2. Xang Lai Hieu Bridge Girder Installation (August 2025) Construction progress in August 2025 has shown Trungnam E&amp;C&#8217;s high level of focus to meet the set objectives. Girder Installation: The installation of Xang Lai Hieu Bridge girders is being urgently carried out, with 63 out of 84 girders installed (each weighing 80 tons), completing 9 out of a total of 12 bridge spans, further affirming the breakthrough effort. \u00a0 Crossbeam and Deck Slab Construction: In parallel with girder installation, Trungnam E&amp;C is actively implementing the construction of crossbeams and deck slabs. These are important items to complete the superstructure, creating the road surface for vehicles. \u00a0 T5, T6 Pier Cap Construction: The construction of T5 and T6 pier caps has been actively implemented, creating a solid foundation for girder installation. Other Items: In addition, roadbed construction, soft soil treatment using CDM piles and wick drains, and culvert construction are also being carried out in the Km120+200-Km122+580 area. \u00a0 Quality Control: Trungnam E&amp;C always prioritizes strict inspection and testing such as frequency testing of galvanized mesh thickness,<\/p>\n","protected":false},"author":3,"featured_media":2216,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[46],"tags":[204,205,206,207],"class_list":["post-2308","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","tag-xang-lai-hieu-bridge-girder-installation","tag-chau-doc-can-tho-soc-trang-expressway","tag-xang-lai-hieu-bridge","tag-expressway-construction-vietnam"],"acf":[],"_links":{"self":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2308"}],"version-history":[{"count":3,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2308\/revisions"}],"predecessor-version":[{"id":2311,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/posts\/2308\/revisions\/2311"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media\/2216"}],"wp:attachment":[{"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trungnamec.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}