My Thuan 2 bridge project with a total investment of more than 5,000 billion VND, scale of 14 bidding packages. In which, 5 construction and installation bidding packages have a very large scale, including: Package XL.01 mentioned above with the package price of 607.199 billion VND; Package XL.02 Construction of the road on the Tien Giang side, section Km104+190 - Km105+454 (including My Hung bridge) and the leading bridge on the Tien Giang side (including 14 Super T spans and the entire lower structure from the M0 abutment) to T13) with the package price of 415.705 billion VND; Package XL.03 Construction of cable-stayed main bridge and riverbank reinforcement embankment (including regulation to ensure navigation safety) has the largest package price, up to VND 1,822.6 billion…